Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

984 unique locations (5473 components) - Page 1 of 40

1020 SLUTCHERS LANE, WARRINGTON, WA1 1QL (3 components)

gas generation

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
132 Manchester Road, Carrington, Trafford, Greater Manchester, England, M31 4AY, (1 component)

Hydrogen Production plant consisting of three of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.

Active • 2027-28 (T-4)
150 Maylands Avenue, Hemel Hempstead, Hertfordshire, HP2 7DF (2 components)

Back up generator at a data centre

Inactive • 2018-19 (T-1)
8.63 MW
150 Maylands Avenue, Hemel Hempstead, Herts, HP2 7DF (1 component)

DSR Component providing load turn down at a data centre

Inactive • 2021-22 (T-4)
12.95 MW
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
167 - 600 Hollands Recycling, Bentley Road South, Darlaston, WS10 8LN (9 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
174 - 601 Farnham Road, Upper Froyle, Alton, GU34 4JD (9 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
17 SHANNON WAY, ASHCHURCH, TEWKESBURY, GL20 8ND (2 components)

The CMU ComponeThe CMU Component reduces import demand by turning off equipment and other non-essential loads.nt reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
195 Aylesone Rd, Leicester LE2 7QJ (24 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2 Leeds City Office Park, Leeds, LS11 5BD (6 components)
• Office site with behind the meter back-up generation
• Office site with behind the meter back-up generation.
DSR Veolia UK Limited Conditional LS11
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
2 LIVINGSTONE BOULEVARD, HAMILTON INTNL TECHNOLOGY PARK, BLANTYRE, GLASGOW, G72 0BP (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
2 Princes Way Solihull West Midlands B91 2ES (2 components)

Embedded diesel generator at Princes Way site

Inactive • 2018-19 (T-1)
2 Whitehouse Way, Peterlee, County Durham, SR8 2RA (4 components)

3 MW of demand reduction

DSR LIMEJUMP LTD Conditional SR8
Inactive • 2022-23 (T-4), 2019-20 (T-1)
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
3 Opal Way, Stone ST15 0BQ, UK (5 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
43 Devon Street, London, SE15 1AL (9 components)
• Lithium ion battery storage at a material recycling facility in south east London.
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (11 components)
• Peak power plant
• Reciprocating engine
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
530 London Road Thornton Heath London CR7 7YE (5 components)

Hospital

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
5 Howick Place London SW1P 1WG (10 components)

The CMU component is an aggregation of turn-down and onsite generation

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
64 Newman Street, London W1T 3EF (2 components)

Battery/generator UPS

Inactive • 2018-19 (T-1)
670 Ajax Avenue, Slough, SL1 4BG (4 components)

DSR Component providing load turn down at a data centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.16 MW
6 Braham St Aldgate London E1 8EE (4 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (3 components)

Offsite with behind the meter generation

Inactive • 2022-23 (T-4), 2019-20 (T-1)
AB38 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
AB54 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
Loading map...
Showing 25 locations