Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

1257 unique locations (5728 components) - Page 1 of 51

XPO - Southampton, Goodward Road, Eastleigh, SO50 4NT (16 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
"Unit 1 Carter Square, Uttoxeter, ST14 8EU" (4 components)

Load curtailment (3)

Inactive β€’ 2023-24 (T-1), 2022-23 (T-1) ...
0.09 MW
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (2 components)

On site reduction in consumption (2)

Active β€’ 2025-26 (T-1), 2024-25 (T-1)
0.23 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (15 components)
β€’ 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
β€’ 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
β€’ 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
2.69 MW
Stagecoach Group Plc, Unit 7 Riverway Esta Portsmouth Road, Peasmarsh Guildford, GU3 1LZ (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active β€’ 2028-29 (T-4), 2025-26 (T-1) ...
"Site Rowridge Rowridge Lane Rowridge Newport Isle of Wight" PO304HT (1 component)

Battery/generator UPS

Inactive β€’ 2018-19 (T-1)
0.16 MW
"SANDY HEATH MAINTENANCE CENTRE Sandy Potton Bedfordshire" SG192NH (1 component)

Battery/generator UPS

Inactive β€’ 2018-19 (T-1)
0.16 MW
Rougham Industrial Estate, Horizon House, Fred Castle Way, Bury St Edmunds, Rougham IP30 9ND, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
OI Manufacturing Alloa Kelliebank House, Glasshouse Loan, Alloa FK10 1NT, United Kingdom (22 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (15 components)

Load reduction on site supported by non-exporting standby generation. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
"Emley Moor SC Jagger Lane Emley Moor Huddersfield West Yorkshire" HD89TQ (1 component)

Battery/generators UPS

Inactive β€’ 2018-19 (T-1)
0.16 MW
"CROYDON SOUTH NORWOOD HILL Croydon Greater London 2" SE256BQ (1 component)

Battery/generator UPS

Inactive β€’ 2018-19 (T-1)
0.16 MW
"Caldbeck Maintenance Centre Brocklebank Caldbeck Wigton Cumbria" CA78DW (1 component)

Battery/generator UPS

Inactive β€’ 2018-19 (T-1)
0.16 MW
Brakes - Peterlee, 5-6 Burdon Drive, North West Industrial Estate, Peterlee, County Durham, SR8 2JH (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
AYLESFORD MOUNT LEEDS LS15 (6 components)

EV charging at residential premises (2)

Active β€’ 2024-25 (T-1), 2023-24 (T-1)
0.10 MW
AYCLIFFE SEWAGE TREATMENT WKS, DURHAM WAY NORTH, NEWTON AYCLIFFE, DL5 6HP (2 components)

On site reduction in consumption (2)

Active β€’ 2025-26 (T-1), 2024-25 (T-1)
0.23 MW
AXMINSTER, EX13 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active β€’ 2025-26 (T-1)
0.00 MW
AVON DRIVE BARNOLDSWICK BB18 (3 components)

EV charging at residential premises

Inactive β€’ 2023-24 (T-1)
0.01 MW
AVENUE THE AVENUE ASPLEY GUISE MILTON KEYNES MK17 (8 components)

EV charging at residential premises (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
0.09 MW
ATOS, Andover Data Centre, Shepherds Spring Lane, Andover, SP10 1DL (4 components)

2.0MW - 2.3MWh Battery Energy Storage System (2)

Active β€’ 2025-26 (T-4), 2022-23 (T-1)
6.28 MW
ASWARBY WW, LONDON ROAD A15 ASWARBY, NG34 9SE (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
3.26 MW
ASTLEY CRESCENT SCOTTER GAINSBOROUGH DN21 (3 components)

EV charging at residential premises

Inactive β€’ 2023-24 (T-1)
0.01 MW
ASPEN CLOSE CONGLETON CW12 (3 components)

EV charging at residential premises

Inactive β€’ 2023-24 (T-1)
0.01 MW
ASPEN CLOSE BUXTON DERBYSHIRE SK17 (12 components)

EV charging at residential premises (3)

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
3.69 MW
ASKET DRIVE SEACROFT LEEDS LS14 (5 components)

EV charging at residential premises (2)

Active β€’ 2024-25 (T-1), 2023-24 (T-1)
0.08 MW
Loading map...
Showing 25 locations