Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

EV Charging

4019 unique locations (54377 components) - Page 145 of 161

TRANFIELD AVENUE GUISELEY LEEDS LS20 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
TREDGOLD CRESCENT BRAMHOPE LEEDS LS16 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
TREE B CASSINGTON ROAD EYNSHAM WITNEY OXFORDSHIRE OX29 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
151.70 MW
TREE COTHERSTONE BARNARD CASTLE DL12 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.42 MW
Tree Cottage Ebdon Road Weston-Super-Mare Avon BS22 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
TREE COTTAGE HULL ROAD SKIRLAUGH HULL HU11 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.04 MW
TREE COTTAGE THE GREEN LONG ITCHINGTON SOUTHAM WARWICKSHIRE CV47 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
TREE FARM PUXTON ROAD HEWISH WESTON-SUPER-MARE BS24 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Treeton Way Catcliffe South Yorkshire S60 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
TREE TOPS COURT LEEDS LS8 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
TRENTLEA WAY SANDBACH CHESHIRE CW11 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Trossachs Road Coventry West Midlands CV5 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
TRUMPSGREEN AVENUE VIRGINIA WATER SURREY GU25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
Trumpsgreen Road Virginia Water Surrey GU25 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
TS10 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
149.75 MW
TS13 (5 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-4) ...
14.46 MW
TS15 (33 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
102.24 MW
TS16 (77 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
30.73 MW
TS17 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
127.86 MW
TS18 (10 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
34.40 MW
TS19 (13 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
21.28 MW
TS21 (23 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
101.95 MW
TS22 (28 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
139.50 MW
TS23 (12 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
41.79 MW
TS27 (15 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
64.02 MW
Loading map...
Showing 25 locations