Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

EV Charging

4019 unique locations (54377 components) - Page 154 of 161

Weston-Subedge CHIPPING CAMPDEN GL55 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
WESTON WAY BALDOCK HERTFORDSHIRE SG7 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
WEST PARK AVENUE LEEDS LS8 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
WEST PARK GROVE LEEDS LS8 (12 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
56.09 MW
WEST PARK SELBY YO8 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
151.26 MW
West Park Villas Leeds West Yorkshire LS8 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
14.02 MW
WEST STREET MAYFIELD TN20 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
WEST WATER CRESCENT HAMPTON VALE PETERBOROUGH CAMBRIDGESHIRE PE7 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
125.99 MW
WESTWICK CRESCENT SHEFFIELD S8 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
WESTWICK ROAD SHEFFIELD S8 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
WESTWOOD ROAD SUTTON COLDFIELD WEST MIDLANDS B73 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
WETHERINGSETT ASHLAND MILTON KEYNES BUCKINGHAMSHIRE MK6 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
21.60 MW
WEYBRIDGE DRIVE MACCLESFIELD CHESHIRE SK10 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
WF1 (24 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
80.98 MW
WF10 (25 components)
• Domestic EV
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
100.29 MW
WF11 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
14.47 MW
WF12 (20 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
131.07 MW
WF15 (9 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
18.61 MW
WF17 (29 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
69.15 MW
WF2 (32 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
118.46 MW
WF3 (41 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
216.34 MW
WF4 (59 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
217.82 MW
WF5 (30 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
127.34 MW
WF8 (22 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
103.01 MW
WF9 (30 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
98.52 MW
Loading map...
Showing 25 locations