Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

EV Charging

6802 unique locations (56980 components) - Page 172 of 273

NORTH VIEW CRESCENT EPSOM SURREY KT18 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
0.02 MW
North View Hungerford Berkshire RG17 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.01 MW
Northways Porthcawl Mid Glamorgan CF36 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
0.02 MW
NORTHWOOD DRIVE, SHEFFIELD, S6 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
0.04 MW
NORTHWOOD FALLS WOODLESFORD LEEDS LS26 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
NORWOOD ROAD CHESHUNT WALTHAM CROSS HERTFORDSHIRE EN8 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.01 MW
NORWOOD ROAD, CHESHUNT, WALTHAM CROSS, HERTFORDSHIRE, EN8 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
0.04 MW
Not Available ? components still to be determined (3 components)

The assets that will be submitted are Pod Point Electric Vehicle chargers which are already deployed into the market. These are internet-connected devices capable of being remote-controlled and remote-monitored

Active • 2025-26 (T-1)
Not year available (6 components)

EV charge station

Active • 2028-29 (T-4)
Not yet known (3 components)
• EV chargers
• battery
Active • 2025-26 (T-1)
NP10 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.12 MW
NP11 (13 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.16 MW
NP15 (13 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
NP18 (13 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.16 MW
NP19 (14 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.10 MW
NP20 (14 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
NP22 (7 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.05 MW
NP25 (24 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.10 MW
NP26 (23 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.05 MW
NP4 (18 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.20 MW
NP44 (16 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.12 MW
NP7 (43 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
125.08 MW
NP8 (14 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.02 MW
NR10 (20 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.15 MW
NR11 (36 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
178.19 MW
Loading map...
Showing 25 locations