Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

EV Charging

6802 unique locations (56980 components) - Page 218 of 273

SO17 (4 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1)
0.09 MW
SO18 (21 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.17 MW
SO19 (17 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.09 MW
SO21 (27 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.11 MW
SO22 (40 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
120.37 MW
SO23 (17 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.07 MW
SO24 (21 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.14 MW
SO30 (36 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
118.04 MW
SO31 (69 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
186.60 MW
SO32 (59 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
234.38 MW
SO40 (36 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
119.36 MW
SO41 (56 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
195.90 MW
SO42 (14 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.02 MW
SO45 (28 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.07 MW
SO50 (50 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2025-26 (T-1) ...
183.36 MW
SO51 (45 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
129.15 MW
SO53 (49 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
165.76 MW
SOAR ROAD, QUORN, LOUGHBOROUGH, LEICESTERSHIRE, LE12 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
0.04 MW
SOMERBY DRIVE SOLIHULL WEST MIDLANDS B91 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
0.02 MW
SOMERDALE AVENUE BROCKWORTH GLOUCESTER GL3 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.01 MW
SOMERSET GROVE WARFIELD BRACKNELL BERKSHIRE RG42 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
0.02 MW
SOMERSET PLACE BATH BA1 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
0.02 MW
Somerton Avenue Richmond Surrey TW9 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
0.02 MW
sothways north street ME17 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.01 MW
sothways north street, ME17 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
0.04 MW
Loading map...
Showing 25 locations