Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

EV Charging

2879 unique locations (50832 components) - Page 27 of 116

SHEPHERDS WAY ST. GEORGES WESTON-SUPER-MARE BS22 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
SHELLEY CRESCENT OULTON LEEDS LS26 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
Shelley Close Oulton Leeds LS26 (5 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
21.03 MW
SHED BARN C NORTH ROAD ABINGTON CAMBRIDGESHIRE CB21 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
178.50 MW
SHADWELL PARK GROVE LEEDS LS17 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
SG9 (16 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
15.16 MW
SG8 (82 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
247.64 MW
SG7 (18 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
44.66 MW
SG6 (35 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
109.00 MW
SG5 (60 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
163.46 MW
SG4 (40 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
160.11 MW
SG3 (15 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
67.69 MW
SG2 (28 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
92.85 MW
SG19 (54 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
166.68 MW
SG18 (68 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
234.49 MW
SG17 (27 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
189.99 MW
SG15 (11 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
23.27 MW
SG14 (17 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
54.08 MW
SG13 (21 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
62.70 MW
SG12 (24 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
138.72 MW
SG11 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
58.67 MW
SG10 (4 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
7.12 MW
SG1 (34 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
94.95 MW
SEVEN ACRES, DENHOLME, BRADFORD, BD13 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
0.04 MW
Selworthy Furzton Milton Keynes MK4 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
21.60 MW
Loading map...
Showing 25 locations