Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

EV Charging

2882 unique locations (50853 components) - Page 45 of 116

NP19 (14 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
48.39 MW
NP18 (13 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
35.43 MW
NP15 (13 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
35.26 MW
NP11 (13 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
62.41 MW
NP10 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
157.59 MW
Not yet known (3 components)
• EV chargers
• battery
Active • 2025-26 (T-1)
14.38 MW
Not year available (8 components)

EV charge station

Active • 2028-29 (T-4)
491.21 MW
Not Available ? components still to be determined (3 components)

The assets that will be submitted are Pod Point Electric Vehicle chargers which are already deployed into the market. These are internet-connected devices capable of being remote-controlled and remote-monitored

Active • 2025-26 (T-1)
47.92 MW
NORTHWOOD FALLS WOODLESFORD LEEDS LS26 (5 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
21.03 MW
NORTH SWEEMING COURT, SHERBURN IN ELMET, LEEDS, LS25 (7 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2023-24 (T-1) ...
14.02 MW
NORTH SWEEMING COURT SHERBURN IN ELMET LEEDS LS25 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
NORTH STREET BURWELL CAMBRIDGE CAMBRIDGESHIRE CB25 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
102.70 MW
NORTH PARK GROVE LEEDS LS8 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
NORTH LODGE PARK MILTON CAMBRIDGE CB24 (18 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
43.20 MW
NORTH BROADGATE LANE HORSFORTH LEEDS LS18 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
Noon Layer Drive Milton Keynes MK10 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.00 MW
NN9 (42 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
155.99 MW
NN8 (30 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
131.45 MW
NN7 (53 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
179.02 MW
NN6 (66 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
220.58 MW
NN5 (36 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
106.95 MW
NN4 (46 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
187.96 MW
NN3 (51 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
221.16 MW
NN29 (21 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
49.36 MW
NN2 (24 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
127.41 MW
Loading map...
Showing 25 locations