EWIC (Ireland)

2 unique locations (12 components)

Active MW: 803.75 MW
Inactive MW: 147.50 MW
Connah's Quay 400 kV Substation (2 components) Geocoding Needed

The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.

EWIC (Ireland) EirGrid Interconnector Designated Activity Company Existing Interconnector CMU EWIC Rejected
Inactive β€’ 2021-22 (T-4), 2018-19 (T-1)
147.50 MW
Connah's Quay 400 kV Substation, Kelsterton Lane, Connah?s Quay, Flintshire, North Wales, CH5 4BP (10 components) Geocoding Needed

The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
803.75 MW