Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

13 unique locations (69 components)

342 Edinburgh Avenue, Slough, SL1 4TU (2 components)

Twin boiler, single steam turbine energy from waste plant exporting at 33kV

Active • 2024-25 (T-4), 2023-24 (T-4)
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (6 components)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Coatbridge, ML5 4UG, Scotland (3 components)

Energy from Waste facility

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
EcoPark, Advent Way, Edmonton, London N18 3AG (13 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.

Active • 2025-26 (T-1), 2024-25 (T-4) ...
17.61 MW
Hay Hall Road, Tyseley, Birmingham, B11 2AU (4 components)
• Energy from Waste facility
• Energy from Waste facility.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
26.87 MW
Newhurst Quarry, Ashby Road East, Shepshed, Leicestershire, LE12 9BU (2 components)

An Energy from Waste facility located in Leicestershire. The facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist …

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Newlands Road Wentloog Cardiff CF3 2EF (2 components)

Energy From Waste facility

Inactive • 2023-24 (T-4), 2021-22 (T-4)
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Plot 8 Protos Grinsome Road Elton CH2 4NR (2 components)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will …

Active • 2024-25 (T-4), 2023-24 (T-4)
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (8 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Westfield Energy Recovery Limited, Lochgelly, Fife. (3 components)

Energy Recovery Facility burning waste

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 13 locations