Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

2 unique locations (3 components)

Active MW: 3385.57 MW
Inactive MW: 42.97 MW
enfinium Kelvin Limited, Giffords Way (off Kelvin Way), West Bromwich, B70 7JR (2 components)

Kelvin is an energy-from-waste facility which is currently under construction with scheduled commissioning in 2025. A connection offer has been accepted with Western Power Distribution. (2)

Energy from Waste ENFINIUM KELVIN LIMITED New Build Generating CMU KL KL B70
Active • 2028-29 (T-4), 2027-28 (T-4)
74.91 MW
enfinium Kelvin Limited, Giffords Way (off Kelvin Way), West Bromwich, B70 7JR (1 component)

Kelvin is an energy-from-waste facility which is currently under construction with scheduled commissioning in 2025. A connection offer has been accepted with Western Power Distribution.

Energy from Waste ENFINIUM KELVIN LIMITED New Build Generating CMU KL B70
Active • 2025-26 (T-1)
43.93 MW
Loading map...
Showing 2 locations