Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

71 unique locations (450 components) - Page 3 of 3

Port Talbot Steelworks, Port Talbot, SA13 2NG (2 components)

The CMU Component is power generation based on Port Talbot Steelworks and using waste gases as the primary fuel . Please see Letter of Clarification attached to the prequalification submission.

Inactive • 2023-24 (T-1)
26.81 MW
Riverside Energy Park Normal Road North, Belvedere London DA17 6JY (2 components)

New build Energy from Waste recovery facility

Active • 2027-28 (T-4), 2026-27 (T-4)
62.30 MW
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (14 components)

Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.73 MW
Showground, Bridgewater, TA6 6PS (1 component)

Energy from waste plant

Active • 2024-25 (T-1)
Simec Uskmouth Power Limited West Nash Road Nash Newport NP18 2BZ (1 component)

Energy pellet generating unit to be installed on the designated land at Uskmouth Power station, West Nash Road Nash. Newport. NP18 2BZ

Active • 2024-25 (T-4)
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (8 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (17 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.34 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (6 components)
• On-Site Generating CMU.
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
38.03 MW
Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN (12 components)
• CARvwm is an Energy Recovery Facility (ERF) which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export up to 35MW. Located in Glass Avenue, Cardiff.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
64.83 MW
Veolia Tyseley, James Road, Tyseley, Birmingham, B11 2BA (17 components)

Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.38 MW
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (16 components)

On-site CHP - existing generating unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.91 MW
Westfield Energy Recovery Limited, Lochgelly, Fife. (3 components)

Energy Recovery Facility burning waste

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Wolverhampton EfW Crown Street West Midlands WV1 1QB (5 components)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change in registered address for WWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
WTI UK Ltd Parc Adfer, Weighbridge road, Deeside Industrial Estate zone 4, Flintshire, CH5 2LL (9 components)

An energy from waste facility located in North Wales and designed to generate electricity

Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.54 MW
Loading map...
Showing 21 locations