Energy from Waste

12 unique locations (114 components)

WTI UK Ltd Parc Adfer, Weighbridge road, Deeside Industrial Estate zone 4, Flintshire, CH5 2LL (10 components)

An energy from waste facility located in North Wales and designed to generate electricity

Active • 2028-29 (T-4), 2023-24 (T-4) ...
45.66 MW
Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN (11 components)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point). Located in Glass Avenue, Cardiff.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export up to 35MW. Located in Glass Avenue, Cardiff.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
95.63 MW
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (11 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (18 components)

Energy from Waste Recovery Facility

Active • 2028-29 (T-4), 2026-27 (T-4) ...
201.60 MW
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Newhaven ERF, North Quay Rd, Newhaven, East Sussex, BN9 0AB (8 components)

Steam turbine at energy from waste facility located in Newhaven East Sussex

Active • 2026-27 (T-4), 2024-25 (T-4) ...
44.87 MW
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (6 components)

Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
10.37 MW
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (10 components)

Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary …

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
EcoPark, Advent Way, Edmonton, London N18 3AG (17 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.

Active • 2025-26 (T-1), 2023-24 (T-4) ...
17.61 MW
Chineham ERF, Whitmarsh Lane, Basingstoke, Hampshire, RG24 8LL (7 components)

Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.

Active • 2028-29 (T-4), 2023-24 (T-4) ...
20.13 MW
Bolton Thermal Recovery Facility Raikes Lane Industrial Estate Bolton Greater Manchester BL3 2NP (3 components)

New Build Energy from Waste Plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (9 components)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
32.61 MW
Loading map...
Showing 12 locations