10 unique locations (184 components)

Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (20 components)
• NB MPAN 1900070394446 -1900070467983. Allington Integrated Waste Management Facility Laverstoke Road 20-20 Business Park Maidstone Kent ME16 0LE. The auxiliary load is not included in the connection capacity i.e. The export is net.
• This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington Integrated Waste Management Facility,500kT Energy from Waste Plant with c. 36MW electrical output. The auxiliary load is not included in the connection capacity i.e. The export is net. There are 2 different MPAN 1900070394446 and 1900070467983, accumulating to the total output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
164.37 MW
Baddesley O&M Ltd, Merevale Lane, Atherstone, Warwickshire, CV9 2LA (7 components)

Energy from Waste plant fuelled by biomass

Active • 2028-29 (T-4), 2025-26 (T-4) ...
36.95 MW
Enterprise Drive, Coven, Wolverhampton, Staffordshire WV10 7DY (7 components)

Municipal waste incineration plant located in Staffordshire. It is based on boilers supplying steam to a turbine-generator.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
93.09 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (10 components)

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
71.95 MW
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (26 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
65.23 MW
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (32 components)
• FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in North Hykeham. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
126.36 MW
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (21 components)

This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
190.72 MW
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (19 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• FCC (E+M) Limited, New build 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
64.60 MW
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (15 components)
• Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations.
• Existing generation unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
160.67 MW
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (27 components)

On-site CHP - existing generating unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
65.89 MW