19 unique locations (241 components)

Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (20 components)
• NB MPAN 1900070394446 -1900070467983. Allington Integrated Waste Management Facility Laverstoke Road 20-20 Business Park Maidstone Kent ME16 0LE. The auxiliary load is not included in the connection capacity i.e. The export is net.
• This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington Integrated Waste Management Facility,500kT Energy from Waste Plant with c. 36MW electrical output. The auxiliary load is not included in the connection capacity i.e. The export is net. There are 2 different MPAN 1900070394446 and 1900070467983, accumulating to the total output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
164.37 MW
Baddesley O&M Ltd, Merevale Lane, Atherstone, Warwickshire, CV9 2LA (7 components)

Energy from Waste plant fuelled by biomass

Active • 2028-29 (T-4), 2025-26 (T-4) ...
36.95 MW
Binn EcoPark Glenfarg Perth Scotland PH2 9PX (1 component)

New Build Municipal waste incineration plant located in Perthshire, Scotland. It is based on one boiler supplying steam to a single turbine-generator. The CMU is connected to the Distribution Network

Active • 2028-29 (T-4)
6.87 MW
enfinium Ferrybridge 1 Limited Kirkhaw Lane off Stranglands Lane Knottingley West Yorkshire WF11 8DX (3 components)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.

Active • 2028-29 (T-4), 2027-28 (T-4)
139.48 MW
enfinium Ferrybridge 2 Limited Kirkhaw Lane, off Stranglands Lane Knottingley West Yorkshire WF11 8DX (3 components)

FM2 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network

Active • 2028-29 (T-4), 2027-28 (T-4)
67.78 MW
Enterprise Drive, Coven, Wolverhampton, Staffordshire WV10 7DY (7 components)

Municipal waste incineration plant located in Staffordshire. It is based on boilers supplying steam to a turbine-generator.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
93.09 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (10 components)

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
71.95 MW
Hay Hall Road, Tyseley, Birmingham, B11 2AU (4 components)
• Energy from Waste facility
• Energy from Waste facility.
Active • 2028-29 (T-4), 2023-24 (T-4)
50.90 MW
Indaver Rivenhall IWMF, Woodhouse Lane, Essex CO5 9DF (2 components)

New Build Energy form Waste facility.

Active • 2028-29 (T-4)
48.42 MW
Indaver Rivenhall IWMF, Woodhouse Lane, Essex, CO5 9DF (2 components)

New Build Energy from waste facility

Active • 2028-29 (T-4)
87.85 MW
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (26 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
65.23 MW
Lakeside EFW, Lakeside Road, Colnbrook, SL3 0FE (12 components)
• Energy From Waste plant located in Colnbrook, capable of generating 40.5MW and exporting over 36 MW to the distribution network.
• Energy From Waste plant located in Colnbrook, capable of generating 41MW and exporting over 36 MW to the distribution network.
• Energy From Waste plant located in Colnbrook.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
225.79 MW
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (32 components)
• FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in North Hykeham. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
126.36 MW
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (21 components)

This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
190.72 MW
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (19 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• FCC (E+M) Limited, New build 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
64.60 MW
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (18 components)

Energy from Waste Recovery Facility

Active • 2028-29 (T-4), 2026-27 (T-4) ...
201.60 MW
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (15 components)
• Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations.
• Existing generation unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
160.67 MW
Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN (12 components)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point). Located in Glass Avenue, Cardiff.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export up to 35MW. Located in Glass Avenue, Cardiff.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
95.63 MW
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (27 components)

On-site CHP - existing generating unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
65.89 MW
Loading map...