Hydro

5 unique locations (91 components)

Tongland, Kirkcudbrightshire. DG6 4LT. Scotland (19 components)
• Tongland hydro power station - Unit 1 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
• Tongland hydro power station - Unit 2 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
• Tongland hydro power station - Unit 3 Part of the Galloway hydroelectric scheme Registered capacity = 41.25MVA or 33MW at 0.8PF. Each of the 3 components = 11MW.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Luichart Power Station, Contin, Strathpeffer, IV14 9EW (7 components)
• Hydro Generation Gensets 1 & 2
• ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
61.92 MW
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (47 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 2 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Glenmoriston Power Station, Fort Augustus, Inverness, IV63 7YH (8 components)
• Gensets 1 & 2
• Gensets 1 & 2 ROCable hydro units within the BMU are not included in the CMU.
• Livishie Hydro Generation Genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
152.80 MW
Deanie Power Station, Kiltarlity, Beauly, IV4 7JX (10 components)
• Deanie Unit 1
• Deanie Unit 2
Active • 2028-29 (T-4), 2025-26 (T-4) ...
34.64 MW
Loading map...
Showing 5 locations