Hydro

10 unique locations (396 components)

Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (10 components)
• 10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements
• Battery Storage
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.09 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (53 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• CHP engine in a horticultural environment, natural gas, no aux load
• Existing CCGT Unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (7 components)
• 1 x hydro turbine & synchronous generator
• 20 MW of DSR
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (27 components)
• A gas fuelled generating station.
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT Baglan Unit 1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
428.74 MW
3 Fountain Drive, Inchinnan Business Park, Paisley, PA4 9RF. (5 components)
• 1 x hydro turbine & synchronous generator
• Bus depot site
• MTU - 8V400064 1.013MW
Active • 2024-25 (T-1), 2023-24 (T-4) ...
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (35 components)
• EV charging at residential premises
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.10 MW
2600 John Smith Drive, Oxford, OX4 2JY (35 components)
• Generating Unit 1
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• Operational gas reciprocating engine.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...