108 unique locations (2197 components) - Page 1 of 5

Wytch Farm, Wareham BH20 5JR (9 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (42 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
WHITTON-WW, Thurleston Lane, Ipswich, Suffolk, IP1 6TG (13 components)

Diesel Generator, Perkins

Inactive • 2017-18 (T-1), 2016-17 (TR)
1.08 MW
Whitewalls Road, Rochester, Kent, ME2 4DZ (2 components)

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
37.40 MW
Whitewall Road, Rochester, Kent, ME2 4DZ (5 components)

A series of gas generators on an existing site.

Active • 2024-25 (T-1), 2023-24 (T-1)
75.98 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (15 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
259.70 MW
Welton WTW, Hackthorn Rd, Welton, LN2 3PD (6 components)

Diesel Generator, Rolls Royce

Inactive • 2017-18 (T-1)
WELLINGBOROUGH-ISE VALLEY TPS, Ditchford Road, Wellingborough, Northamptonshire, NN8 1RG (13 components)

Generator, Perkins, 4016TAG1A

Inactive • 2017-18 (T-1), 2016-17 (TR)
1.08 MW
Victory Road, Derby, Derbyshire, DE24 9HX (6 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Active • 2026-27 (T-4), 2023-24 (T-4) ...
113.94 MW
426.46 MW
Ty Coch Farm Greenfield Holywell CH87HT (11 components)

Gas fuelled generation plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.50 MW
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HW (5 components)
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2020-21 (T-4), 2019-20 (T-1)
TILBURY STW, Fort Road, Thurrock, Essex, RM18 8UJ (43 components)
• Cummins - Natural Gas Engine
• Diesel Generator, Cummins, KTA38G
• Diesel Generator, Dorman, 16SETCA
Inactive • 2017-18 (T-1), 2016-17 (TR)
2.51 MW
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
5.70 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (2 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4)
24.31 MW
SUTTERTON RESERVOIR, Spalding Road, Sutterton, Lincolnshire, PE20 2EW (12 components)

Diesel Generator, Dorman, 12STCAR3

Inactive • 2017-18 (T-1), 2016-17 (TR)
0.72 MW
18.26 MW
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (2 components)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Inactive • 2022-23 (T-4)
RWE Cogen UK Ltd North Road Ellesmere Port South Wirral CH65 1AF (11 components)
• CMU will be formed of multiple individual gas reiprocating engine units
• Cheshire OCGT - Currently no additional load on the Private Network - Auxiliary load behind boundary meter
Inactive • 2020-21 (T-4), 2017-18 (T-1)
RUSHBROOKE-WS, Rushbrooke Lane, Rushbrooke, Suffolk, IP30 2RS (11 components)

Diesel Generator, Perkins, 3012TAG1A

Inactive • 2017-18 (T-1), 2016-17 (TR)
0.72 MW
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 component)

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Inactive • 2022-23 (T-4)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (7 components)
• 10 x 2MW OCGT gas reciprocating engines
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
116.16 MW
RAVENSTHORPE WW, Teeton Road, Ravensthorpe, Northamptonshire, NN6 8LS (11 components)

Diesel Generator, Perkins

Inactive • 2017-18 (T-1), 2016-17 (TR)
0.72 MW
Loading map...