OCGT and Reciprocating Engines (Fuel Type - Gas)
227 unique locations (463 components) - Page 1 of 10
Yard adjacent to Manchester Road, Westhoughton BL5 3QH (1 component)
Gas fired generating units
Wordsworth Crushing Limited, Whaley Road, Barugh, Barnsley S75 1FJ (1 component)
The CMU Component will be made up of gas fired engines.
Woburn Road, Bedford, MK43 9AH See attached location note (1 component)
Gas fired reciprocating engines.
Wincham Lane, Wincham, Northwich CW9 6DE (4 components)
Willow Holme Road, Carlisle, CA2 5RN (1 component)
Gas fired reciprocating engines
Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RR (2 components)
Wheldale 1 Wheldale Generation Site Wheldale Road Castleford West Yorkshire WF10 2RR (2 components)
Watling Rd, Bishop Auckland DL14 9AS (2 components)
New build power station comprised of multiple reciprocating engines. (2)
Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components)
Water Orton, Birmingham, B46 1NU See attached location note (2 components)
Gas fired reciprocating engines.
Walton Road, Burton Upon Trent, DE15 9NG (4 components)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
Vale Farm, Enmill Lane, Pitt, Winchester, SO22 5QW (2 components)
Vacant Land off Station Rd, Nursling, Southampton SO16 0YD, UK (1 component)
16MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Vacant land off Middleton Road, Morecambe, Lancaster, LA3 3NT (1 component)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Vacant land off Middleton Road, Morecambe Lancaster, LA3 3NT (1 component)
15.5 MW power plant comprising 8 gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Vacant land off Middleton Road, Morecambe, Lancashire, LA3 3NT (1 component)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Vacant Land, Griffiths Road, Lostock Gralam, Northwich CW9 7ZR (1 component)
20 MW power plant comprising 10 x 2MW gas reciprocating engines. The power plant will be connected to the local electricity distribution network and local gas network.
Unit J1 Aven Industrial Park, Tickhill Road, Maltby, Rotherham, S66 7QR (3 components)
Gas fired generating sets (3)
Unit H, Lyon Road, Bletchley, Milton Keynes MK1 1EX (2 components)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
Unit D, Kendale Rd, Scunthorpe DN16 1DT (10 components)
Unit A, The Loddon Centre, Basingstoke RG24 8QW (1 component)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the Local distribution network and local gas network.
Unit 6, Lime Kilns Business Park, Hinckley LE10 3EL (1 component)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
Unit 3, 2 Anchor Lane, Bilston, West Midlands, WV14 9NA (1 component)
A New Build 8MW Gas Fuelled Generating Station.
Unit 27A Aber Park Aber Road Flint CH6 5EX (1 component)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Unit 2, 2 Anchor Lane, Bilston, West Midlands, WV14 9NA (1 component)
A New Build 8MW Gas Fuelled Generating Station.