Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

45 unique locations (248 components) - Page 1 of 2

Wytch Farm, Wareham BH20 5JR (5 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Wolverhampton Powerhouse, Commercial Road, Wolverhampton WV1 3QS (3 components)
• A 4MW generating gas grid support plant.
• A 4MW generating grid support plant.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
WH Davis, Langwith Rd, Shirebrook, Mansfield, Derbyshire NG20 9SA (4 components)
• Diesel and/or gas dual fuel generating station.
• New Build. Gas and/or dual fuel generating station.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Whaley Rd, Barugh Green, Barnsley S75 1HS, UK (2 components)

one 1.2MW caterpillar generator

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Waterswallows Road Buxton Derbyshire SK17 7JB (14 components)
• 2.115MW Diesel and/or dual fuel reciprocating engine
• 2.115mw diesel/ and or gas dual fuel reciprocating engine
• 2.116MW Diesel and / or gas dual fuel reciprocating engine
Inactive • 2018-19 (T-1)
Unit 2c (N), North Road, Marchwood Industrial Park, Marchwood SO40 4BL (5 components)
• The CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. The CMU is metered at the distribution boundary using a COP2 meter. There is no auxilliary load on site.
• This CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. It uses a COP2 meter at the distribution boundary and has no auxilliary load or additional generation on site.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Sands Leisure Complex, Burnison Road, Scarborough, YO12 6PH (2 components)

Two 1.2MW caterpillar generators

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Snape Lane, Doncaster, DN11 8RU (3 components)
• A 7MW gas fuelled generating station.
• A 7MW new build gas fuelled generating station.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Rounponds Energy Limited Roundponds Farm, Melksham, Wiltshire SN12 8DF (5 components)
• New build diesel or gas dual fuel generating station
• New build reciprocating generating station
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Radstone Rd, Radstone, Brackley NN13 5PY (6 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
4.68 MW
Prothero Industrial Estate, Bilport Lane, Wednesbury, West Midlands WS10 0NT (2 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate for export.

Inactive • 2018-19 (T-1)
Plot 15, Sherburn Rail Freight Terminal New Lennerton Lane Leeds LS25 6LH (2 components)

CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Plant Yard, Howard Yard, Redditch, B98 7SG (38 components)
• 2.115MW Diesel and or gas dual fuel reciprocating engine
• 2.115MW diesel and/or gas dual fuel reciprocating engine
• 2.116mw diesel and / or gas dual fuel reciprocating engine
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Part Of Plots 15 And 16 Unit Rw 1 Bankwood Lane New Rossington Doncaster DN11 0PS (5 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
O?Brien Skip Hire, Old Droppingwell Road, Sheffield, S61 2DJ (3 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Nottinghamshire Recycling Centre, Shireoaks Road, Worksop S80 3HA (3 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Monks Lane, Corsham, Wiltshire SN13 9PH (3 components)

Diesel and/or gas dual fuel generating station.

Inactive • 2018-19 (T-1)
Lodge Lane, Haydock WA12 0HH (7 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land to the South of Wolverhampton Penn sub-station, Union Lane, Lower Penn, South Staffordshire, WV5 7JD. (2 components)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
LAND TO THE REAR OF UNIT 26A, RASSAU INDUSTRIAL ESTATE, EBBW VALE NP23 5SD (4 components)

A generating station consisting multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate for export.

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Land to the north of Thelwall Lane, Warrington WA4 1PD (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
Land off Peel Road, Fylde, FY4 5LN (3 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land East Of Edgemoor Titchsborough Hill Otterham Station Camelford Cornwall PL32 9XU (8 components)
• A new build diesel and/or gas dual fuel generating station consisting of 47 generator units of 440KW each
• An operational 20 MW diesel fuelled generating station with existing T-1 and T-4 CM Contracts.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Loading map...
Showing 25 locations