Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

10 unique locations (53 components)

Wytch Farm, Wareham BH20 5JR (5 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Snape Lane, Doncaster, DN11 8RU (3 components)
• A 7MW gas fuelled generating station.
• A 7MW new build gas fuelled generating station.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Rounponds Energy Limited Roundponds Farm, Melksham, Wiltshire SN12 8DF (5 components)
• New build diesel or gas dual fuel generating station
• New build reciprocating generating station
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Part Of Plots 15 And 16 Unit Rw 1 Bankwood Lane New Rossington Doncaster DN11 0PS (5 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land at Ernest Nunn Road, Stowmarket IP14 2AH (4 components)

CMU is a new 20MW facility, metered on the distrbution boundary using a COP2 meter with no auxilliary load on site.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Burn Park Farm, Cottingham, HU16 5SB (5 components)
• Battery storage plant
• Gas Peaking Reciprocating engines
• Gas peaking reciprocating engine
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Hills Storage & Distribution Centre Stanley Way Stanley Industrial Estate Skelmersdale WN8 8EA (5 components)
• 20MW gas fuelled generating station
• A new build gas fuelled generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Cadeby 1 CMM Generation Garden Lane Cadeby Doncaster DN5 7SN (7 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
• Gas generating unit(s)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
3.05 MW
Loading map...
Showing 10 locations