Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

104 unique locations (445 components) - Page 1 of 5

25 Southfield Lingard Lane Stockport SK6 2QN (16 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (6 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
• Gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (2 components)

Gas generation peaking plant comprising of 9 x 2MW engines

Inactive • 2022-23 (T-4), 2021-22 (T-4)
A38 Gloucester Road, Filton, Bristol, South Gloucestershire, BS34 7QE (5 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (59 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 7 OCGT fuel type gasoil
• Aberthaw 8 OCGT fuel is distillate
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (4 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Aldon Road, Poulton - Le - Fylde, Lancashire FY6 8JL (2 components)
• Battery Storage Facilty
• Energy facility comprising of reciprocating engine sets.
Inactive • 2021-22 (T-4)
Amy Johnson Way Blackpool FY4 2RP (5 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 1.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
Ashton Old Road, Manchester, Greater Manchester, M11 1AA (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Askern 1 CMM Generation Campsall Road Askern Doncaster DN6 0BZ (4 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
Inactive • 2021-22 (T-4), 2016-17 (TR)
3.05 MW
Aspatria Business Park, Park Road, Aspatria, Cumbria, CA7 3DP (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines
Active • 2024-25 (T-4), 2021-22 (T-4)
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (22 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT Baglan Unit 1
• Existing CHP/OCGT module
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Balle Street, Darwen, Lancashire BB3 2AZ (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (4 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Bootle Data Centre, Bridle Road, Bootle, L30 1PH (3 components)
• 11MW of 60 minute frequency response, battery storage
• two 1.4MW caterpillar generators
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Botley Road, Romsey, Southampton, SO51 9DF (1 component)

New build power station comprised of multiple reciprocating engines

Inactive • 2021-22 (T-4)
Bradford Road Batley Kirklees WF17 6JS (19 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Briscoe Lane, Newton Heath, Manchester, M40 2XS (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Bristol Avenue Moor Park Blackpool FY2 0LZ (8 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Cadeby 1 CMM Generation Garden Lane Cadeby Doncaster DN5 7SN (7 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
• Gas generating unit(s)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
3.05 MW
Carlton Forest, Blyth Road, Worksop, S81 0TP (3 components)
• A New Build 10MW Fuelled Generating Station.
• A New Build 8MW ACT generating station using a closed loop steam system.
• A New Build 8MW Fuelled Generating Station.
Inactive • 2021-22 (T-4)
Challenge Way, Blackburn, Lancashire, BB1 5RR (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Claycliffe Rd, Barnsley, S75 1HS (5 components)
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Crimplesham Main Road, Crimplesham, King's Lynn, Norfolk, PE33 9EA (1 component)

9 x 4.767MVA (3.81MW) gas engines in a peaking plant environment

Inactive • 2021-22 (T-4)
Cyclopark, The Tollgate, Watling Street, Istead Rise, Gravesend, DA11 7NP (3 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations