Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

25 unique locations (520 components)

25 Southfield Lingard Lane Stockport SK6 2QN (21 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4), 2022-23 (T-4)
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (37 components)
• New build gas generator
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
11.29 MW
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (4 components)

Gas generation peaking plant comprising of 9 x 2MW engines

Inactive • 2021-22 (T-4), 2022-23 (T-4)
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (92 components)
• Aberthaw 7 OCGT fuel type gasoil
• Aberthaw 8 OCGT fuel is distillate
• Aberthaw 9 OCGT fuel type is gasoil
Active • 2021-22 (T-4), 2022-23 (T-3) ...
2434.55 MW
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (30 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CHP module
• Existing OCGT module
Active • 2021-22 (T-4), 2022-23 (T-3) ...
428.74 MW
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (6 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2018-19 (T-1), 2021-22 (T-4) ...
Bradford Road Batley Kirklees WF17 6JS (21 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Inactive • 2021-22 (T-4), 2022-23 (T-3) ...
Bristol Avenue Moor Park Blackpool FY2 0LZ (12 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4), 2022-23 (T-4)
Cadeby 1 CMM Generation Garden Lane Cadeby Doncaster DN5 7SN (14 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
• Gas generating unit(s)
Inactive • 2016-17 (TR), 2019-20 (T-1) ...
3.05 MW
Dunnikier Peaking Power, Wheatfield Road, Kirkcaldy. Fife. KY1 3PE (3 components)

The CMU is a new reciprocating engine based gas fuelled generating unit.

Inactive • 2021-22 (T-4), 2022-23 (T-4)
31252.77 MW
GREENMOOR BANK FARM, OLD HUTTON, KENDAL, LA8 0NT (3 components)
• Battery Storage Plant
• Gas peaking reciprocating engine
• Gas peaking reciprocating engines
Inactive • 2021-22 (T-4), 2022-23 (T-4)
47.60 MW
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (14 components)
• Gas engine system capable of exporting electricity.
• Multiple gas engines capable of exporting electricity.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
9.52 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (29 components)
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2022-23 (T-3), 2022-23 (T-4) ...
3881.97 MW
Longridge Road, Preston, Lancashire PR2 5NQ (9 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
38.04 MW
Meek Street, Royton, Oldham, Lancashire OL2 6HL (8 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
38.04 MW
Shaw House Farm, Clitheroe Road, Whalley, Clitheroe, BB7 9AD (6 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2022-23 (T-4)
The Power House 38 Haughton Road Darlington DL1 1ST (26 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 17.5MW of containerised, gas-fired generating capacity together with transformers, switchgear and associated control gear
Inactive • 2021-22 (T-4), 2022-23 (T-3) ...
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (20 components)
• New build gas generator
• Operational reciprocating gas engines
Active • 2022-23 (T-4), 2023-24 (T-4) ...
15.06 MW
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (3 components)
• Gas engines in a peaking plant environment
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2021-22 (T-4), 2022-23 (T-4)
Wytch Farm, Wareham BH20 5JR (9 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2018-19 (T-1), 2019-20 (T-1) ...
Loading map...
Showing 25 locations