OCGT and Reciprocating Engines

10 unique locations (575 components)

CA3 (28 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
85.77 MW
G22 (2 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4)
44.41 MW
GU4 7RE (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
LL29 (30 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
62.64 MW
NE34 (44 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
98.69 MW
NN3 (100 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
221.16 MW
PE9 (126 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
206.05 MW
S60 (112 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
87.45 MW
WF2 (92 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
118.46 MW
WS3 (40 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
190.08 MW
Loading map...
Showing 10 locations