Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

2 unique locations (2 components)

Active MW: 39347.90 MW
Inactive MW: 12.07 MW
Plot 15, Sherburn Rail Freight Terminal New Lennerton Lane Leeds LS25 6LH (1 component)

CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site

OCGT and Reciprocating Engines SelectGen Limited New Build Generating CMU Selby Plot 15 LS25
Inactive • 2021-22 (T-4)
Plot 15, Sherburn Rail Freight Terminal New Lennerton Lane Leeds LS25 6LH (1 component)

CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site

OCGT and Reciprocating Engines SelectGen Limited New Build Generating CMU Selby Plot 15 LS25
Inactive • 2018-19 (T-1)
Loading map...
Showing 2 locations