138 unique locations (615 components) - Page 1 of 6

Active MW: 39347.90 MW
Inactive MW: 12.07 MW
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear (2)

Reciprocating engines OCGT and Reciprocating Engines Shovel Ready 1 Limited New Build Generating CMU Southfield 25 Southfield 25 Conditional SK6
Inactive • 2022-23 (T-4), 2021-22 (T-4)
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (4 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
• Gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (26 components)
• Operational gas reciprocating engine. (2)
• Operational Reciprocating Engine
Reciprocating engines OCGT and Reciprocating Engines GREENSPAN NIFTY FIFTY LIMITED Existing Generating CMU Wardpark Alpha Wardpark Alpha +14 more G67
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (4 components)

A new build gas fuelled generating station. (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (2 components)

Gas generation peaking plant comprising of 9 x 2MW engines (2)

Reciprocating engines OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX51 FLEX51 Conditional YO19
Inactive • 2022-23 (T-4), 2021-22 (T-4)
A38 Gloucester Road, Filton, Bristol, South Gloucestershire, BS34 7QE (3 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Bristol Energy Bristol Energy +1 more BS34
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (30 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (3 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Viking Power Viking Power +1 more TS2
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Aldon Road, Poulton - Le - Fylde, Lancashire FY6 8JL (2 components)
• Battery Storage Facilty
• Energy facility comprising of reciprocating engine sets.
Storage OCGT and Reciprocating Engines ALDON POWER LIMITED New Build Generating CMU Aldon Aldon Rejected FY6
Inactive • 2021-22 (T-4)
Amy Johnson Way Blackpool FY4 2RP (5 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 1.5MW together with transformers, switchgear and associated control gear

OCGT and Reciprocating Engines CONRAD (LYTHAM) LIMITED New Build Generating CMU Amy Johnson Way Not Prequalified FY4
Inactive • 2021-22 (T-4)
Ashton Old Road, Manchester, Greater Manchester, M11 1AA (1 component)

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines ASHTON POWER LIMITED New Build Generating CMU Ashton Rejected M11
Inactive • 2021-22 (T-4)
Askern 1 CMM Generation Campsall Road Askern Doncaster DN6 0BZ (2 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
OCGT and Reciprocating Engines REGENT PARK ENERGY LIMITED Existing Generating CMU Regent Park - CMM DN6
Inactive • 2021-22 (T-4), 2016-17 (TR)
Aspatria Business Park, Park Road, Aspatria, Cumbria, CA7 3DP (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines
Reciprocating engines OCGT and Reciprocating Engines SWB Power Ltd New Build Generating CMU Aspatria BP Not Prequalified CA7
Active • 2024-25 (T-4), 2021-22 (T-4)
Attune Energy, Ernsettle Lane, Plymouth, PL5 2TS (2 components)
• CMU Component is 500kVA reciprocating diesel engine.
• This CMU is a 20MW distrubution connected facility that has been operational since November 2016. It is metered on the distrbution boundary using a COP2 meter and had no auxilliary load on site.
OCGT and Reciprocating Engines ATTUNE ENERGY LIMITED Existing Generating CMU Plymouth A Plymouth A PL5
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (16 components)
• Existing CCGT Baglan Unit 1 (2)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Balle Street, Darwen, Lancashire BB3 2AZ (1 component)

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines STOR 130 LTD New Build Generating CMU Balle Rejected BB3
Inactive • 2021-22 (T-4)
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (3 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Bootle Data Centre, Bridle Road, Bootle, L30 1PH (3 components)
• two 1.4MW caterpillar generators (2)
• 11MW of 60 minute frequency response, battery storage
Storage OCGT and Reciprocating Engines ABBEY HEAT AND POWER CO LIMITED Existing Generating CMU New Build Generating CMU AHAP1 AHAP1 Rejected L30
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Botley Road, Romsey, Southampton, SO51 9DF (1 component)

New build power station comprised of multiple reciprocating engines

OCGT and Reciprocating Engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Not Prequalified SO51
Inactive • 2021-22 (T-4)
Bradford Road Batley Kirklees WF17 6JS (18 components)
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear (2)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
Reciprocating engines OCGT and Reciprocating Engines Shovel Ready 9 Limited New Build Generating CMU Bradford Road, Batley Bradford Road, Batley Not Prequalified WF17
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Briscoe Lane, Newton Heath, Manchester, M40 2XS (1 component)

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines STOR 121 Ltd New Build Generating CMU Briscoe Not Prequalified M40
Inactive • 2021-22 (T-4)
Bristol Avenue Moor Park Blackpool FY2 0LZ (8 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear (2)

Reciprocating engines OCGT and Reciprocating Engines Shovel Ready 8 Limited New Build Generating CMU Bristol Avenue Bristol Avenue Conditional FY2
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Cadeby 1 CMM Generation Garden Lane Cadeby Doncaster DN5 7SN (3 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
• Gas generating unit(s)
Reciprocating engines OCGT and Reciprocating Engines REGENT PARK ENERGY LIMITED Existing Generating CMU Regent Park - CMM Regent Park - CMM Rejected DN5
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Carlton Forest, Blyth Road, Worksop, S81 0TP (2 components)
• A New Build 10MW Fuelled Generating Station.
• A New Build 8MW ACT generating station using a closed loop steam system.
Inactive • 2021-22 (T-4)
Challenge Way, Blackburn, Lancashire, BB1 5RR (1 component)

Energy facility comprising of reciprocating engine sets.

OCGT and Reciprocating Engines STOR 148 LTD New Build Generating CMU Whitebirk BB1
Inactive • 2021-22 (T-4)