111 unique locations (1274 components) - Page 2 of 5

Claycliffe Rd, Barnsley, S75 1HS (9 components)
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (33 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 1 - OCGT, fuel is gas-oil
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
Active • 2023-24 (T-4), 2024-25 (T-4) ...
496.48 MW
Crimplesham Main Road, Crimplesham, King's Lynn, Norfolk, PE33 9EA (2 components)

9 x 4.767MVA (3.81MW) gas engines in a peaking plant environment

Inactive • 2021-22 (T-4)
Croespenmaen, Newport, Caerphilly NP11 3BP, Wales (4 components)

The CMU is a new 20MW facility, connected via a COP2 meter at the distribution boundary, with no auxilliary load on site.

Inactive • 2018-19 (T-1)
Cyclopark, The Tollgate, Watling Street, Istead Rise, Gravesend, DA11 7NP (4 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2018-19 (T-1), 2021-22 (T-4)
Daisymere Lane Buxton Derbyshire SK17 7JW UK (60 components)
• 2.115MW diesel reciprocating engine
• 2.116MW Diesel reciprocating engine
• 2.116MW diesel reciprocating engine
Inactive • 2017-18 (T-1), 2018-19 (T-1)
Daisymere Lane, Buxton Derbyshire SK17 7JW UK (9 components)

2.116MW diesel reciprocating engine

Inactive • 2017-18 (T-1), 2018-19 (T-1)
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (80 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
Active • 2024-25 (T-4), 2025-26 (T-4) ...
565.82 MW
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (11 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
Duncombe Road Bradford BD8 9RR (10 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
Dunnikier Peaking Power, Wheatfield Road, Kirkcaldy. Fife. KY1 3PE (3 components)

The CMU is a new reciprocating engine based gas fuelled generating unit.

Inactive • 2021-22 (T-4), 2022-23 (T-4)
Ecclesfield 35 Industrial Estate, Station Road, Sheffield, South Yourkshire, S35 9YR (8 components)
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
EDF Land, Cliff Quay, Ipswich Docks, Suffolk (10 components)
• A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.
• Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.
Inactive • 2018-19 (T-1), 2021-22 (T-4)
31252.77 MW
Former Techboard Site. Rassau Industrial Estate, Rassau, Ebbw Vale NP23 5SD (9 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, for export.

Inactive • 2017-18 (T-1), 2018-19 (T-1)
Fort Parkway, Heartlands, Birmingham, B24 9QT (14 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
GREENMOOR BANK FARM, OLD HUTTON, KENDAL, LA8 0NT (3 components)
• Battery Storage Plant
• Gas peaking reciprocating engine
• Gas peaking reciprocating engines
Inactive • 2021-22 (T-4), 2022-23 (T-4)
Hills Storage & Distribution Centre Stanley Way Stanley Industrial Estate Skelmersdale WN8 8EA (10 components)
• 20MW gas fuelled generating station
• A new build gas fuelled generating station.
Inactive • 2018-19 (T-1), 2019-20 (T-1) ...
Holden Way, Dukinfield, SK16 5LP (2 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets.
Inactive • 2021-22 (T-4)
Holditch House Industrial Estate Holditch Road Newcastle-under-Lyme ST5 9JQ (4 components)

installation of multiple reciprocating generator sets

Inactive • 2018-19 (T-1)
Land 15, Carr hill, Balby, Doncaster, DN4 8DG (11 components)
• A 10MW new build gas fuelled generating station.
• A new build gas fuelled generating station.
Inactive • 2017-18 (T-1), 2018-19 (T-1) ...
Land Adjacent Sub Station (Major), Lower Dunton Road, Bulphan, Essex, SP11 9LR (2 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4)