Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

83 unique locations (683 components) - Page 2 of 4

Ferndale Park, Century Road, Hull HU12 8FB (1 component)

New build power station comprising of 20MW reciprocating generators, transformers and associated control room,switch room within a secure fenced compound.

Inactive • 2021-22 (T-4)
Former Techboard Site. Rassau Industrial Estate, Rassau, Ebbw Vale NP23 5SD (9 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, for export.

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Fort Parkway, Heartlands, Birmingham, B24 9QT (14 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Greystoke Road, Penrith, Cumbria, CA11 0BX (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Hillbarton Business Park Sidmouth Road Clyst St Mary Exeter EX5 1DR (1 component)

A Waste to Energy (WtE) plant delivering a net export capacity of 9.80MW.

Inactive • 2021-22 (T-4)
Hills Storage & Distribution Centre Stanley Way Stanley Industrial Estate Skelmersdale WN8 8EA (10 components)
• 20MW gas fuelled generating station
• A new build gas fuelled generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Lambley Lane, Gedling, Nottingham NG4 4PB, UK (1 component)

A new build 20MW gas or dual fuel fired generation station for grid support.

Inactive • 2021-22 (T-4)
Land 15, Carr hill, Balby, Doncaster, DN4 8DG (11 components)
• A 10MW new build gas fuelled generating station.
• A new build gas fuelled generating station.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Land adjacent to Haydock Cross Industrial Estate Kilbuck Lane Haydock WA11 9SR (5 components)

Gas engine system capable of exporting electricity.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land at Burn Park Farm, Cottingham, HU16 5SB (7 components)
• Battery storage plant
• Gas Peaking Reciprocating engines
• Gas peaking reciprocating engine
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land at Ernest Nunn Road, Stowmarket IP14 2AH (6 components)

CMU is a new 20MW facility, metered on the distrbution boundary using a COP2 meter with no auxilliary load on site.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land East Of Edgemoor Titchsborough Hill Otterham Station Camelford Cornwall PL32 9XU (15 components)
• A new build diesel and/or gas dual fuel generating station consisting of 47 generator units of 440KW each
• An operational 20 MW diesel fuelled generating station with existing T-1 and T-4 CM Contracts.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
LAND TO THE REAR OF UNIT 26A, RASSAU INDUSTRIAL ESTATE, EBBW VALE NP23 5SD (9 components)

A generating station consisting multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate for export.

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Land west of Basildon substation, Lower Dunton Road, Basildon, Essex, SS16 6EB (1 component)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4)
Lodge Lane, Haydock WA12 0HH (12 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Longcliffe Quarry, B5056, Matlock, Derbyshire DE4 4HN, UK (16 components)
• Battery Storage facility
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Long Lane, Westhoughton, Bolton, BL5 3QR (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Lostock Hollow, Lostock Gralam, Northwich CW9 7PA, UK (1 component)

16MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution and gas network.

Inactive • 2021-22 (T-4)
Lutterworth Road, Rugby, Warwickshire CV23 0QW (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Maltby 1 Colliery Ltd Tickhill Road Rotherham South Yorkshire S66 7QW (8 components)
• 8x 1.40MW Containerised Generating sets.
• Gas fired generating sets.
Inactive • 2021-22 (T-4), 2016-17 (TR)
3.05 MW
Marsh Green Idustrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY (8 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Monks Lane, Corsham, Wiltshire SN13 9PH (5 components)

Diesel and/or gas dual fuel generating station.

Inactive • 2018-19 (T-1)
Loading map...
Showing 25 locations