OCGT and Reciprocating Engines

121 unique locations (506 components) - Page 5 of 5

Challenge Way, Blackburn, Lancashire, BB1 5RR (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Carlton Forest, Blyth Road, Worksop, S81 0TP (3 components)
• A New Build 10MW Fuelled Generating Station.
• A New Build 8MW ACT generating station using a closed loop steam system.
• A New Build 8MW Fuelled Generating Station.
Inactive • 2021-22 (T-4)
Cadeby 1 CMM Generation Garden Lane Cadeby Doncaster DN5 7SN (7 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
• Gas generating unit(s)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
3.05 MW
Bristol Avenue Moor Park Blackpool FY2 0LZ (8 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Briscoe Lane, Newton Heath, Manchester, M40 2XS (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Bradford Road Batley Kirklees WF17 6JS (19 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Botley Road, Romsey, Southampton, SO51 9DF (1 component)

New build power station comprised of multiple reciprocating engines

Inactive • 2021-22 (T-4)
Bootle Data Centre, Bridle Road, Bootle, L30 1PH (3 components)
• 11MW of 60 minute frequency response, battery storage
• two 1.4MW caterpillar generators
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (4 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Balle Street, Darwen, Lancashire BB3 2AZ (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Attune Energy, Ernsettle Lane, Plymouth, PL5 2TS (4 components)
• CMU Component is 500kVA reciprocating diesel engine.
• This CMU is a 20MW distrubution connected facility that has been operational since November 2016. It is metered on the distrbution boundary using a COP2 meter and had no auxilliary load on site.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Askern 1 CMM Generation Campsall Road Askern Doncaster DN6 0BZ (4 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
Inactive • 2021-22 (T-4), 2016-17 (TR)
3.05 MW
Ashton Old Road, Manchester, Greater Manchester, M11 1AA (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Amy Johnson Way Blackpool FY4 2RP (5 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 1.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
35.55 MW
Aldon Road, Poulton - Le - Fylde, Lancashire FY6 8JL (2 components)
• Battery Storage Facilty
• Energy facility comprising of reciprocating engine sets.
Inactive • 2021-22 (T-4)
15.30 MW
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (4 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
158.70 MW
A38 Gloucester Road, Filton, Bristol, South Gloucestershire, BS34 7QE (6 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
213.04 MW
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (2 components)

Gas generation peaking plant comprising of 9 x 2MW engines (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
33.24 MW
151.12 MW
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (7 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
• Gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
117.60 MW
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
303.94 MW
Loading map...
Showing 21 locations