OCGT and Reciprocating Engines (Fuel Type - Gas)

17 unique locations (347 components)

Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (25 components)

A generating station consisting on multiple reciprocating engines and alternators located on a single site

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.06 MW
Rockingham South, Smoke Land, Avonmouth BS11 0YT (7 components)
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
• The CMU will consist of 2 MW's of containerised battery storage.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Newton Aycliffe CO Durham DL5 6EA (24 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.91 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (16 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• Gas reciprocating engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.49 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (21 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.09 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (21 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.23 MW
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.75 MW
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 3TD (7 components)
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
• Gas reciprocating engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.44 MW
Cavendish Rd Stevenage SG1 2ET UK (23 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (44 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3471.17 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (9 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2022-23 (T-4) ...
9.15 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (27 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.70 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (23 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.71 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (14 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
9.84 MW
4 Finway Road Hemel Hempstead HP2 7PT (21 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.23 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (22 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.23 MW
Loading map...
Showing 17 locations