5 unique locations (26 components)

Active MW: 20139.41 MW
Inactive MW: 10208.38 MW
Plot G11 Bennett Street, Bridgend Industrial Estate, Bridgend, CF31 3SA (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
37.80 MW
Morganite, Swansea, SA6 8PP (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
26.50 MW
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Styal Road Power Station Styal Road Power Station +8 more M22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.96 MW
Ex Gas Works Site Land west of Afan Way Port Talbot, SA12 6HQ (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4), 2018-19 (T-1)
37.80 MW
Alders Way, Paignton, TQ4 7QL (2 components)
• Construction of new small embedded power station site consisting of engines and ancillaries with new major plant items such as mains gas connection capacity (where appropriate), distribution grid connection capacity and associated works and civils. To the best of our knowledge and belief, the CMU will meet the Extended Years Criteria (as per rule 3.7.2 (a)). These criteria will be met by the installation of new apparatus capable of remaining in operation for 15 years or more beginning with the first delivery year and that the plant will be compliant with all relevant emissions and energy efficiency standards that could be expected of a new plant of the same type, size and energy source in Great Britain and the European Union.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
OCGT and Reciprocating Engines (Fuel Type - Gas) UK Energy Reserve Limited New Build Generating CMU Cadishead Power Station TQ4
Inactive • 2020-21 (T-4), 2018-19 (T-1)
37.80 MW
Loading map...
Showing 5 locations