Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

60 unique locations (377 components) - Page 1 of 3

Wytch Farm, Wareham BH20 5JR (7 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Wolverhampton Powerhouse, Commercial Road, Wolverhampton WV1 3QS (4 components)
• A 4MW generating gas grid support plant.
• A 4MW generating grid support plant.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S803LH (4 components)

Reciprocating engines

Inactive • 2021-22 (T-4), 2018-19 (T-1)
WH Davis, Langwith Rd, Shirebrook, Mansfield, Derbyshire NG20 9SA (4 components)
• Diesel and/or gas dual fuel generating station.
• New Build. Gas and/or dual fuel generating station.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
WH Davis, Langwith Rd, Shirebrook, Mansfield, Derbyshire NG20 9SA (2 components)
• Diesel and/or gas dual fuel generating station.
• New Build. Gas and/or dual fuel generating station.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Whaley Rd, Barugh Green, Barnsley S75 1HS, UK (3 components)

one 1.2MW caterpillar generator

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Waterswallows Road Buxton Derbyshire SK17 7JB (21 components)
• 2.115MW Diesel and/or dual fuel reciprocating engine
• 2.115MW Diesel and/or gas dual fuel reciprocating engine
• 2.115mw diesel and/or gas dual fuel reciprocating engine
• ... and 2 more unique descriptions
Inactive • 2018-19 (T-1)
Unit 2c (N), North Road, Marchwood Industrial Park, Marchwood SO40 4BL (7 components)
• The CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. The CMU is metered at the distribution boundary using a COP2 meter. There is no auxilliary load on site.
• This CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. It uses a COP2 meter at the distribution boundary and has no auxilliary load or additional generation on site.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Sands Leisure Complex, Burnison Road, Scarborough, YO12 6PH (3 components)

Two 1.2MW caterpillar generators

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Snape Lane, Doncaster, DN11 8RU (5 components)
• A 7MW gas fuelled generating station.
• A 7MW new build gas fuelled generating station.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Rounponds Energy Limited Roundponds Farm, Melksham, Wiltshire SN12 8DF (5 components)
• New build diesel or gas dual fuel generating station
• New build reciprocating generating station
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Rounponds Energy Limited Roundponds Farm, Melksham, Wiltshire SN12 8DF (2 components)
• New build diesel or gas dual fuel generating station
• New build reciprocating generating station
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Radstone Rd, Radstone, Brackley NN13 5PY (7 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
4.68 MW
Prothero Industrial Estate, Bilport Lane, Wednesbury, West Midlands WS10 0NT (2 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate for export.

Inactive • 2018-19 (T-1)
Prothero Industrial Estate, Bilport Lane, Wednesbury, West Midlands WS10 0NT (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate for export.

Inactive • 2018-19 (T-1)
Plot 15, Sherburn Rail Freight Terminal New Lennerton Lane Leeds LS25 6LH (2 components)

CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Plot 15, Sherburn Rail Freight Terminal New Lennerton Lane Leeds LS25 6LH (1 component)

CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site

Inactive • 2018-19 (T-1)
Plant Yard, Howard Yard, Redditch, B98 7SG (58 components)
• 2.115MW Diesel and / or gas dual fuel reciprocating engine
• 2.115MW Diesel and or gas dual fuel reciprocating engine
• 2.115MW diesel and/or gas dual fuel reciprocating engine
• ... and 2 more unique descriptions
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Part Of Plots 15 And 16 Unit Rw 1 Bankwood Lane New Rossington Doncaster DN11 0PS (7 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
O?Brien Skip Hire, Old Droppingwell Road, Sheffield, S61 2DJ (4 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Nottinghamshire Recycling Centre, Shireoaks Road, Worksop S80 3HA (4 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Monks Lane, Corsham, Wiltshire SN13 9PH (4 components)

Diesel and/or gas dual fuel generating station.

Inactive • 2018-19 (T-1)
Monks Lane Corsham Wiltshire SN13 9PH (2 components)

Diesel or gas generating station.

Inactive • 2018-19 (T-1)
Monks Lane Corsham Wiltshire SN13 9PH (1 component)

Diesel or gas generating station.

Inactive • 2018-19 (T-1)
Lodge Lane, Haydock WA12 0HH (10 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 25 locations