Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (66 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (15 components)
• Component has yet to be procured.
• New build gas generator
• Operational reciprocating gas engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.06 MW
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (23 components)
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (47 components)
• A gas engine CHP site providing hot water to a local district heating network
• One of three CHP in a horticultural environment
• One of three CHP in a horticultural environment.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
38.34 MW
LONG ACRE FARM, BIRTLEY, CHESTER LE STREET, DH3 1RQ. (Nearest postcode to grid reference: NE9 7UA). (7 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Component has yet to be procured.
• Gas peaking reciprocating engine
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cargill PLC, Trafford Park, Manchester, M17 1PA (66 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2025-26 (T-4) ...
93.80 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (17 components)
• New build battery storage.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
31.11 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW