15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (17 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Aggregate CMU from multiple sources
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (3 components)

Gas generation peaking plant comprising of 9 x 2MW engines

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW
ASDA Bedford - Chilled Distribution Centre, Marsh Leys, Woburn Rd, MK43 9AB (13 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
20.36 MW
Asda Boston, Pudding Lane Spalding, Lincs, PE11 3TJ (7 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Load curtailment at site via standby generation
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Auchencrosh Converter Station, Glenapp Estate, Ballantrae, Girvan, KA26 0NY (6 components)
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
• Peterhead CCGT
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
140.00 MW
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (27 components)
• A gas fuelled generating station.
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT Baglan Unit 1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
428.74 MW
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (7 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• One of three CHP in a horticultural environment
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Bradford Road Batley Kirklees WF17 6JS (18 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 13-turbine wind farm located in Lanark, Scotland with the installed capacity of 45.000MW
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Active • 2026-27 (T-4), 2023-24 (T-4) ...
3.03 MW
Bristol Avenue Moor Park Blackpool FY2 0LZ (4 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Bristol Avenue Moor Park Blackpool FY2 0LZ (5 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Unproven DSR yet to be procured
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Cadeby 1 CMM Generation Garden Lane Cadeby Doncaster DN5 7SN (5 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
• Gas generating unit(s)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (17 components)
• New build battery storage.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
31.11 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (66 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2025-26 (T-4) ...
93.80 MW
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (8 components)
• 1 x hydro turbine & synchronous generator
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines.
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Dunnikier Peaking Power, Wheatfield Road, Kirkcaldy. Fife. KY1 3PE (4 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• The CMU is a new reciprocating engine based gas fuelled generating unit.
Active • 2024-25 (T-4), 2022-23 (T-4) ...
EDF Energy, Heysham 1 power station, Morecambe, Lancashire, LA3 2XF (14 components)
• 49.99MW Lithium-ion Energy Storage System
• Battery energy storage unit
• Peak power plant
Active • 2027-28 (T-4), 2024-25 (T-1) ...
709.09 MW
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (21 components)
• Site with behind the meter diesel generation - offsetting site load and exporting surplus.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.75 MW
Grimethorpe CMM Generation Plant, Springvale Road, Grimethorpe S72 7BF (6 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (14 components)
• Battery strorage unit
• Gas Peaking Reciprocating Engine
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
47.60 MW
Land on the south east side of Rycote Lane, Milton Common, Thame,  OX9 2PB (11 components)
• Battery Energy Storage System
• Gas peaking reciprocating engine
• Little Barford 1 OCGT . fuel type is distillate
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (21 components)
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
• Multiple gas engines capable of exporting electricity.
• The CMU is a Open Cycle Gas Turbine (OCGT)
Active • 2026-27 (T-4), 2024-25 (T-4) ...
323.62 MW
Land to the South of Wolverhampton Penn sub-station, Union Lane, Lower Penn, South Staffordshire, WV5 7JD. (4 components)
• Energy facility comprising of reciprocating engine sets.
• Gas fired generating unit(s)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...