Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

2 unique locations (40 components)

The Power House 38 Haughton Road Darlington DL1 1ST (22 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 17.5MW of containerised, gas-fired generating capacity together with transformers, switchgear and associated control gear
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bradford Road Batley Kirklees WF17 6JS (18 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 13-turbine wind farm located in Lanark, Scotland with the installed capacity of 45.000MW
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Active • 2026-27 (T-4), 2023-24 (T-4) ...
3.03 MW
Loading map...
Showing 2 locations