Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

7 unique locations (413 components)

Bristol Avenue Moor Park Blackpool FY2 0LZ (12 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
HA2 (68 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
117.58 MW
HP23 (54 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
62.86 MW
HP5 (66 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
147.17 MW
IP13 (70 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
141.75 MW
IV32 (9 components)

Domestic EV charger

Active • 2024-25 (T-1), 2024-25 (T-4)
PR3 (134 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
219.02 MW
Loading map...
Showing 7 locations