Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

150 unique locations (1056 components) - Page 4 of 6

LAND TO THE REAR OF UNIT 26A, RASSAU INDUSTRIAL ESTATE, EBBW VALE NP23 5SD (3 components)

A generating station consisting multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate for export.

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Land to the north of Thelwall Lane, Warrington WA4 1PD (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (15 components)
• Gas engine system capable of exporting electricity.
• Multiple gas engines capable of exporting electricity.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land off Peel Road, Fylde, FY4 5LN (4 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land East Of Edgemoor Titchsborough Hill Otterham Station Camelford Cornwall PL32 9XU (8 components)
• A new build diesel and/or gas dual fuel generating station consisting of 47 generator units of 440KW each
• An operational 20 MW diesel fuelled generating station with existing T-1 and T-4 CM Contracts.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Land East Of Edgemoor Titchsborough Hill Otterham Station Camelford Cornwall PL32 9XU (4 components)
• A new build diesel and/or gas dual fuel generating station consisting of 47 generator units of 440KW each
• An operational 20 MW diesel fuelled generating station with existing T-1 and T-4 CM Contracts.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Land at Ernest Nunn Road, Stowmarket IP14 2AH (6 components)

CMU is a new 20MW facility, metered on the distrbution boundary using a COP2 meter with no auxilliary load on site.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Earnest Nunn Road, Stowmarket, IP14 2AH (3 components)

CMU is a new 20MW facility, metered on the edge of the distrbution boundary using a COP2 meter and with no auxilliary load on site.

Inactive • 2018-19 (T-1)
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (9 components)
• Battery Storage Plant
• Battery storage plant
• Gas Peaking Reciprocating Engine
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Burn Park Farm, Cottingham, HU16 5SB (7 components)
• Battery storage plant
• Gas Peaking Reciprocating engines
• Gas peaking reciprocating engine
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land adjacent to Haydock Cross Industrial Estate Kilbuck Lane Haydock WA11 9SR (3 components)

Gas engine system capable of exporting electricity.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land adjacent to Haydock Cross Industrial Estate Kilbuck Lane Haydock WA11 9SR (1 component)

Gas engine system capable of exporting electricity.

Inactive • 2018-19 (T-1)
Land Adjacent to Britannia House Dock Road Poulton CH41 1DF (2 components)
• 10MW Gas Reciprocating Engines envisaged to be made up of multiple modules
• 15MW BESS envisaged to be made up of multiple modules operated at 5MW
Inactive • 2021-22 (T-4)
Land Adjacent Sub Station (Major), Lower Dunton Road, Bulphan, Essex, SP11 9LR (1 component)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4)
Land 15, Carr hill, Balby, Doncaster, DN4 8DG (9 components)
• A 10MW new build gas fuelled generating station.
• A new build gas fuelled generating station.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Lambley Lane, Gedling, Nottingham NG4 4PB, UK (1 component)

A new build 20MW gas or dual fuel fired generation station for grid support.

Inactive • 2021-22 (T-4)
Kellingley Colliery Turvers Lane, Knottingley, West Yorkshire, WF11 8DT. (7 components)
• 5 x Jenbacher 320 (1.4MW)
• 5 x Jenbacher 420 (1.4MW)
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Holditch House Industrial Estate Holditch Road Newcastle-under-Lyme ST5 9JQ (2 components)

installation of multiple reciprocating generator sets

Inactive • 2018-19 (T-1)
Holditch House Industrial Estate Holditch Road Newcastle-under-Lyme ST5 9JQ (1 component)

installation of multiple reciprocating generator sets

Inactive • 2018-19 (T-1)
Holden Way, Dukinfield, SK16 5LP (2 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets.
Inactive • 2021-22 (T-4)
Hills Storage & Distribution Centre Stanley Way Stanley Industrial Estate Skelmersdale WN8 8EA (5 components)
• 20MW gas fuelled generating station
• A new build gas fuelled generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Hills Storage & Distribution Centre Stanley Way Stanley Industrial Estate Skelmersdale WN8 8EA (2 components)
• 20MW gas fuelled generating station
• A new build gas fuelled generating station.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Hillbarton Business Park Sidmouth Road Clyst St Mary Exeter EX5 1DR (1 component)

A Waste to Energy (WtE) plant delivering a net export capacity of 9.80MW.

Inactive • 2021-22 (T-4)
Loading map...
Showing 25 locations