Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

134 unique locations (611 components) - Page 5 of 6

Factory Lane, Croydon, Surrey, CR0 3LE (7 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
EDF Land, Cliff Quay, Ipswich Docks, Suffolk (7 components)
• A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.
• Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Ecclesfield 35 Industrial Estate, Station Road, Sheffield, South Yourkshire, S35 9YR (7 components)
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Dunnikier Peaking Power, Wheatfield Road, Kirkcaldy. Fife. KY1 3PE (2 components)

The CMU is a new reciprocating engine based gas fuelled generating unit.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Duncombe Road Bradford BD8 9RR (8 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
Dorehouse Business Park Sheffield S13 9LT BB10 2TN (8 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
Dig Gate Lane, Kingsway, Rochdale, OL16 4NR (1 component)

New build power station comprised of multiple reciprocating engines

Inactive • 2021-22 (T-4)
Daisymere Lane, Buxton Derbyshire SK17 7JW UK (7 components)

2.116MW diesel reciprocating engine

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Daisymere Lane Buxton Derbyshire SK17 7JW UK (46 components)
• 2.115MW Diesel reciprocating engine
• 2.115MW diesel reciprocating engine
• 2.116MW Diesel reciprocating engine
• ... and 1 more unique description
Inactive • 2018-19 (T-1), 2017-18 (T-1)
15.94 MW
Cyclopark, The Tollgate, Watling Street, Istead Rise, Gravesend, DA11 7NP (4 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Croespenmaen, Newport, Caerphilly NP11 3BP, Wales (3 components)

The CMU is a new 20MW facility, connected via a COP2 meter at the distribution boundary, with no auxilliary load on site.

Inactive • 2018-19 (T-1)
Crimplesham Main Road, Crimplesham, King's Lynn, Norfolk, PE33 9EA (1 component)

9 x 4.767MVA (3.81MW) gas engines in a peaking plant environment

Inactive • 2021-22 (T-4)
Claycliffe Rd, Barnsley, S75 1HS (7 components)
• Diesel and/or gas reciprocating engines.
• gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Challenge Way, Blackburn, Lancashire, BB1 5RR (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Carlton Forest, Blyth Road, Worksop, S81 0TP (3 components)
• A New Build 10MW Fuelled Generating Station.
• A New Build 8MW ACT generating station using a closed loop steam system.
• A New Build 8MW Fuelled Generating Station.
Inactive • 2021-22 (T-4)
Cadeby 1 CMM Generation Garden Lane Cadeby Doncaster DN5 7SN (7 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
• Gas generating unit(s)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
3.05 MW
Bristol Avenue Moor Park Blackpool FY2 0LZ (8 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Briscoe Lane, Newton Heath, Manchester, M40 2XS (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Bradford Road Batley Kirklees WF17 6JS (20 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Botley Road, Romsey, Southampton, SO51 9DF (1 component)

New build power station comprised of multiple reciprocating engines

Inactive • 2021-22 (T-4)
Bootle Data Centre, Bridle Road, Bootle, L30 1PH (4 components)
• 11MW of 60 minute frequency response, battery storage
• two 1.4MW caterpillar generators
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (5 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Balle Street, Darwen, Lancashire BB3 2AZ (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Attune Energy, Ernsettle Lane, Plymouth, PL5 2TS (7 components)
• CMU Component is 500kVA reciprocating diesel engine.
• This CMU is a 20MW distrubution connected facility that has been operational since November 2016. It is metered on the distrbution boundary using a COP2 meter and had no auxilliary load on site.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Askern 1 CMM Generation Campsall Road Askern Doncaster DN6 0BZ (4 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
Inactive • 2021-22 (T-4), 2016-17 (TR)
3.05 MW
Loading map...
Showing 25 locations