39 unique locations (1412 components) - Page 1 of 2

Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (42 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
232.80 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (7 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …

Active • 2022-23 (T-3), 2022-23 (T-4) ...
2154.60 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (23 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2019-20 (T-1), 2020-21 (T-4) ...
2330.50 MW
Victory Road, Derby, Derbyshire, DE24 9HX (6 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Active • 2021-22 (T-4), 2022-23 (T-3) ...
113.94 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (29 components)
• Existing CCGT
• Existing CCGT to be refurbished
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
2257.82 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (46 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 3 - CCGT MSID: 7210
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6018.18 MW
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (15 components)

Single Shaft CCGT (Module 2)

Active • 2023-24 (T-4), 2024-25 (T-4) ...
966.27 MW
Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP (17 components)

Multi Shaft CCGT (Module 1)

Active • 2023-24 (T-4), 2024-25 (T-4) ...
2171.63 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (100 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe Unit 3 coal-fired unit
Active • 2023-24 (T-4), 2024-25 (T-4) ...
3602.30 MW
Power Station Road Isle of Grain Rochester ME3 0AR (82 components)
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2024-25 (T-4), 2025-26 (T-4) ...
5014.90 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (28 components)
• Peterhead 1
• Peterhead 1 for Delivery Year 2017/18 only
• Peterhead CCGT
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6471.35 MW
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (5 components)

Existing OCGT plant.

Active • 2025-26 (T-4), 2026-27 (T-4) ...
918.41 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (56 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6359.67 MW
Newton Aycliffe CO Durham DL5 6EA (30 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
27.91 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (50 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2025-26 (T-1), 2025-26 (T-4) ...
3397.00 MW
Medway Power Station, Rochester, Medway, ME3 0AG (34 components)
• Medway
• Medway CCGT
Active • 2025-26 (T-1), 2025-26 (T-4) ...
6669.90 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (12 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2023-24 (T-1), 2025-26 (T-4) ...
211.92 MW
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (19 components)
• Gensets 1. 2 & 3
• Marchwood CCGT
Active • 2024-25 (T-4), 2025-26 (T-4) ...
3678.80 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (14 components)
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
220.53 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (29 components)
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2022-23 (T-3), 2022-23 (T-4) ...
3881.97 MW
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (7 components)
• A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• Combined Cycle Gas Turbine plant
Active • 2024-25 (T-4), 2025-26 (T-4) ...
5480.84 MW
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (77 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2024-25 (T-4), 2025-26 (T-4) ...
2714.06 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (65 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6623.53 MW
Indian Queens Power Station St. Dennis St. Austell PL26 8BY (17 components)
• Indian Queens Power Station
• Indian Queens Power Station. Extra information: Technology Class and Fuel Type: "OCGT and Reciprocating Engines: Diesel".
Active • 2024-25 (T-4), 2025-26 (T-4) ...
499.40 MW
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (9 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2023-24 (T-4), 2024-25 (T-4) ...
1757.33 MW
Loading map...