Open Cycle Gas Turbine (OCGT)

126 unique locations (2455 components) - Page 1 of 6

Wytch Farm, Wareham BH20 5JR (9 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2018-19 (T-1), 2019-20 (T-1) ...
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (42 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
232.80 MW
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (7 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. Metering of output is Net of auxillary load.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
Inactive • 2020-21 (T-4), 2021-22 (T-4) ...
720.00 MW
Whitewalls Road, Rochester, Kent, ME2 4DZ (2 components)

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
37.40 MW
Whitewall Road, Rochester, Kent, ME2 4DZ (5 components)

A series of gas generators on an existing site.

Active • 2023-24 (T-1), 2024-25 (T-1)
75.98 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (7 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …

Active • 2022-23 (T-3), 2022-23 (T-4) ...
2154.60 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (15 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2019-20 (T-1), 2022-23 (T-4) ...
259.70 MW
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (8 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …

Active • 2017-18 (T-1), 2020-21 (T-4) ...
1338.64 MW
West Marsh Road Spalding Lincolnshire PE11 2BB (3 components)
• A new combined cycle power station comprising gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
• A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Inactive • 2020-21 (T-4), 2021-22 (T-4)
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (23 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2019-20 (T-1), 2020-21 (T-4) ...
2330.50 MW
Victory Road, Derby, Derbyshire, DE24 9HX (6 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Active • 2021-22 (T-4), 2022-23 (T-3) ...
113.94 MW
426.46 MW
Ty Coch Farm Greenfield Holywell CH87HT (11 components)

Gas fuelled generation plant

Active • 2022-23 (T-3), 2022-23 (T-4) ...
9.50 MW
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HW (5 components)
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2019-20 (T-1), 2020-21 (T-4)
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
Inactive • 2020-21 (T-4), 2021-22 (T-4) ...
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure

Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
5.70 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (2 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2023-24 (T-4), 2024-25 (T-4)
24.31 MW
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (12 components)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being …

Active • 2022-23 (T-3), 2022-23 (T-4) ...
1985.92 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (29 components)
• Existing CCGT
• Existing CCGT to be refurbished
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
2257.82 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (46 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 3 - CCGT MSID: 7210
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6018.18 MW
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (2 components)

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones …

Inactive • 2023-24 (T-4)
488.34 MW
18.26 MW
Severn Power Station West Nash Road Newport NP18 2BZ (12 components)

Existing CCGT unit

Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
434.35 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (19 components)
• Existing CCGT Unit
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2023-24 (T-4), 2024-25 (T-1) ...
1551.59 MW