Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Onshore Wind

5 unique locations (187 components)

SE9 (59 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
125.00 MW
S81 (119 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
71.89 MW
Farr Wind Farm, Garbole Road, Tomatin, Inverness, IV13 7ZA (4 components)

This CMU component represent one half of Farr wind Farm.

Active • 2028-29 (T-4), 2027-28 (T-4)
12.58 MW
Coventry Road Burbage HINCKLEY LEICESTERSHIRE LE10 (2 components)

This CMU component represent one half of Farr wind Farm.

Active • 2028-29 (T-4), 2025-26 (T-1)
3.05 MW
BECKWITH CRESCENT HARROGATE HG2 (3 components)
• Load curtailment
• This CMU component represent one half of Farr wind Farm.
Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.05 MW
Loading map...
Showing 5 locations