Onshore Wind

41 unique locations (120 components) - Page 1 of 2

60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
5.50 MW
Aikengall IIa Wind Farm Innerwick EH42 1SG (6 components)

Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.57 MW
Alva, Clackmannanshire, Scotland, FK14 7JZ (4 components)
• Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system (2)
• Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.22 MW
Ardrossan Windfarm, Haupland and Busbie Muir, Little Busbie Farm, Ardrossan, Ayrshire, KA22 7NU (2 components)

This CMU is Ardrossan wind farm, an onshore wind farm situated in Scotland (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
4.09 MW
Artfield Fell Wind Farm, Glenluce, Wigtonshire, DG8 0PD (1 component)

Wind farm consisting of 15 wind turbines

Active • 2028-29 (T-4)
1.90 MW
Artfield Fell Wind Farm, Glenluce, Wigtonshore, DG8 0PD (1 component)

Wind farm consisting of 15 wind turbines

Active • 2027-28 (T-4)
2.01 MW
Black Law Windfarm, Climpy, Forth, B715, South Lanarkshire ML11 8EW (1 component)

An onshore windfarm of 54 x 2.3MW Wind Turbine Generators with a generating capacity of 124MW and an optimised Transmission Entry Capacity of 118MW.

Active • 2028-29 (T-4)
7.84 MW
Broubster and Achaveilan North Forests, Reay, Caithness, Scotland, KW14 7RD (1 component)

5 x 4.2MW wind turbine generators to be installed on the lands of Broubster Forest and Achaveilan North Forest, Caithness, Scotland.

Active • 2025-26 (T-4)
Brownhill Farm, West Benhar Road, Eastfield, Harthill, Shotts, North Lanarkshire, ML7 5TG (2 components)
• 1 Wind Turbine Generator
• 1 x Wind Turbine Generator
Active • 2026-27 (T-4)
0.57 MW
C35, Castle Douglas , Scotland, DG7 3UF (2 components)

12-turbine wind farm located in Scotland with the installed capacity of 43.200MW (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
6.14 MW
C35, DG7 3UF, Castle Douglas , Scotland (6 components)

12-turbine wind farm located in Scotland with the installed capacity of 43.200MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.01 MW
Causeymire Wind Farm, Achkeepster, Watten Wick, Caithness, KW1 5XR (3 components)

This CMU unit is Causeymire wind farm, an onshore wind farm located in Scotland (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
9.81 MW
Craigdarroch Farm, DG4 6LE, Sanquhar, Dumfries and Galloway, Scotland (6 components)

9-turbine wind farm located in Scotland with the installed capacity of 37.800MW

Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.63 MW
Crossdykes Wind Farm, Langholm, Lockerbie, DG11 2QL (12 components)
• 23.000MW of Wind Generation
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2024-25 (T-4), 2023-24 (T-1) ...
1.89 MW
Cumberhead Wind Farm, Douglas, Lanark, ML11 0SY (4 components)
• Existing generation windfarm.
• New build windfarm.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.23 MW
Dalquhandy Wind Farm, Dalquhandy Opencast Coal Site, Middlemuir Road, Coalburn, ML11 0EL (4 components)

New build onshore wind farm.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.28 MW
Dalquhandy Wind Farm, Dalquhandy Opencast Coal Site, Middlemuir Road, Coalburn, ML11 0NN (3 components)
• 10 turbine onshore wind farm with a gross installed capacity of 42 MW in Lanarkshire, Scotland
• New build onshore wind farm.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
3.24 MW
Dalswinton Windfarm, Adjacent to Shaws Farm, Auldgirth, Dumfries and Galloway, DG2 0YB (2 components)

This CMU is Dalswinton wind farm, an onshore wind farm situated in Scotland (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
4.10 MW
Enoch Hill Wind Farm, Dalleagles, connecting via New Cumnock Substation, Cummnock, KA6 7PT (1 component)

The BMU is a Wind farm consisting of up to 16 wind turbines and associated infrastructure consisting of access tracks , substation and array cables

Active • 2026-27 (T-4)
4.65 MW
Gordonbush Wind Farm, Brora, Sutherland, KW9 6LX (4 components)

Wind Farm with 11 Wind turbines

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Greengairs Wind Farm, Greengairs, ML6 7TY (3 components)

Onshore Wind Farm at Greengairs

Active • 2027-28 (T-4), 2024-25 (T-1) ...
2.53 MW
Hazelside, Glespin, Lanark, Scotland, ML11 0RL (11 components)

13-turbine wind farm located in Lanark, Scotland with the installed capacity of 45.000MW

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.99 MW
High Constellation Wind Farm, near Clachan, Tarbert, Argyll and Bute, PA29 6XR (1 component)

New build onshore wind farm.

Active • 2025-26 (T-4)
High Swainston Farm, Wolviston, Billingham, England, TS22 5NS (2 components)

Walkway MPAN 1 ID: 1574000280390 MPAN 2 ID: 1574000280405 The CMU is an onshore windfarm connected to the distribution system (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
1.87 MW
Loading map...
Showing 25 locations