Onshore Wind

11 unique locations (28 components)

Strathallan Wind Farm Land at Greenscares Plantation Langside Road Braco Perth FK15 9LN (2 components)

4x Enercon E70 E4 / 2300kW - curtailed to meet the grid connection export agreement of 8.000 MW. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
1.15 MW
*Please see cover letter regarding postcode Blary Hill wind farm, Off C20 road (Barr Glen Road), Glenbarr, Tarbert, Scotland, UK (2 components)

New build wind farm at Blary Hill consisting of 14 wind turbines. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.74 MW
*Please see cover letter regarding postcode Aberarder Wind Farm, Aberarder Estate, Strathnairn, Highland Scotland (2 components)

New build wind farm at Aberarder consisting of 12 wind turbines. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
8.20 MW
Artfield Fell Wind Farm, Glenluce, Wigtonshore, DG8 0PD (1 component)

Wind farm consisting of 15 wind turbines

Active • 2027-28 (T-4)
2.01 MW
Artfield Fell Wind Farm, Glenluce, Wigtonshire, DG8 0PD (1 component)

Wind farm consisting of 15 wind turbines

Active • 2028-29 (T-4)
1.90 MW
Ardrossan Windfarm, Haupland and Busbie Muir, Little Busbie Farm, Ardrossan, Ayrshire, KA22 7NU (2 components)

This CMU is Ardrossan wind farm, an onshore wind farm situated in Scotland (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
4.09 MW
Alva, Clackmannanshire, Scotland, FK14 7JZ (4 components)
• Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system (2)
• Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.22 MW
Aikengall IIa Wind Farm Innerwick EH42 1SG (6 components)

Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.87 MW
Aikengall IIa Wind Farm Innerwick EH42 1SG (3 components)

Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
18.42 MW
60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
5.50 MW
3km south of Tweedsmuir, Scottish Borders, ML12 6QR (nearest) (2 components)

New build onshore wind farm. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
9.35 MW