Onshore Wind

11 unique locations (174 components)

Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (7 components)
• Battery located behind the meter within football stadium, able tor educe imported electricity and/or export to the local network
• Commercial sites
• Gas reciprocating engines.
Active • 2024-25 (T-4), 2024-25 (T-1) ...
6.38 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
255.05 MW
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (15 components)
• Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system.
• CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2027-28 (T-4), 2023-24 (T-1) ...
19.32 MW
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (15 components)
• 13-turbine wind farm located in Lanark, Scotland with the installed capacity of 45.000MW
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
44.63 MW
Milton Keynes University Hospital Standing Way, Eaglestone, Milton Keynes, MK6 5LD (14 components)
• Generator at the Hospital
• Load reduction on site supported by non-exporting standby generation.
• Onshore Wind Farm at Greengairs
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
11.93 MW
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (27 components)
• New build onshore wind farm project. 13 no. wind turbine generator wind farm with an installed capacity of 62.4MW located in South Lanarkshire, Southern Scotland
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
• One of three CHP in a horticultural environment.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.65 MW
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (35 components)
• 4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
128.11 MW
Land north west of Gilston Farm, Heriot, Scottish Borders, EH37 5TF (3 components)
• N/A
• New build onshore wind farm.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Harting Rig Wind Farm, Lambhill Road, Nr Strathaven, South Lanarkshire, ML106XF (3 components)
• Aggregate CMU from multiple sources
• Wind Turbine Generators x 15
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.04 MW
Bradford Road Batley Kirklees WF17 6JS (18 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 13-turbine wind farm located in Lanark, Scotland with the installed capacity of 45.000MW
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Active • 2026-27 (T-4), 2023-24 (T-4) ...
3.03 MW
Address: Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (21 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
• Gas fired CHP
• New build wind farm at Aberarder consisting of 12 wind turbines.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
29.34 MW
Loading map...
Showing 11 locations