Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Onshore Wind

103 unique locations (638 components) - Page 1 of 5

Whitelee Windfarm, Eaglesham Moor, to the south of Glasgow. G76 0QQ (2 components)

An onshore windfarm of 140x2.3 MW Wind turbine Generators with an export capacity of 305 MW. It is shared with a 50MW BESS project (CMU - WLBAT1)

Active • 2028-29 (T-4)
33.86 MW
Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (7 components)
• Battery located behind the meter within football stadium, able tor educe imported electricity and/or export to the local network
• Commercial sites
• Gas reciprocating engines.
Active • 2024-25 (T-4), 2024-25 (T-1) ...
6.38 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
255.05 MW
West Benhar Windfarm off the B717 Benhar Road, Nr Shotts, ML7 5BJ (2 components)
• The CMU is an onshore windfarm connection to the distribution system at Drumcross substation
• West Benhar MPAN ID: 1800061208159 The CMU is a onshore windfarm connection to the distribution system at a Drumcross substation
Active • 2025-26 (T-1), 2024-25 (T-1)
4.64 MW
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (4 components)
• 1 x 4.2MW Onshore Wind Turbine Generator
• 1 x Wind Turbine Generating Unit
Inactive • 2023-24 (T-1)
2.06 MW
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (1 component)

1 x 4.2MW Onshore Wind Turbine Generator

Inactive • 2023-24 (T-1)
0.34 MW
Watson Head Farm Watson Head Road Allanton Wishaw ML2 9PL (2 components)

1 x Wind Turbine Generating Unit

Active • 2026-27 (T-4), 2023-24 (T-1)
0.63 MW
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (15 components)
• Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system.
• CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2027-28 (T-4), 2023-24 (T-1) ...
19.32 MW
Todholes Farm, Denny Road, Fintry, Glasgow, G63 0XH (2 components)

Earlsburn Wind Farm

Active • 2028-29 (T-4)
4.89 MW
The site is located next to A836, Crask, Highland, Scotland (3 components)
• 22 wind turbines new built with expected capacity installed of 79.2 MW
• 22 wind turbines new built with expected capacity installed of 92.4 MW
Active • 2024-25 (T-4), 2022-23 (T-3)
7.08 MW
17.42 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build windfarm.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
41.74 MW
Strathallan Wind Farm Land at Greenscares Plantation Langside Road Braco Perth FK15 9LN (2 components)

4x Enercon E70 E4 / 2300kW - curtailed to meet the grid connection export agreement of 8.000 MW.

Active • 2028-29 (T-4), 2025-26 (T-1)
1.15 MW
Stokeford Farm, East Stoke, Wareham, Dorset, BH20 7NU, England (1 component)

4 x 2MW wind turbine generators to be installed on the lands of Stokeford Farm, East Stoke, Dorset, England.

Active • 2025-26 (T-4)
0.50 MW
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (15 components)
• 13-turbine wind farm located in Lanark, Scotland with the installed capacity of 45.000MW
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
44.63 MW
2.39 MW
South Kyle Wind Farm, New Cumnock (off B741), Dalmellington, Ayr, KA6 7FP (2 components)

50 Turbine onshore wind farm with a gross installed capacity of 240 MW in East Ayrshire, Scotland

Active • 2028-29 (T-4), 2025-26 (T-1)
33.72 MW
Runcorn site HQ, South Parade, PO Box 9, Runcorn, WA7 4JE (12 components)
• 10MW of onshore wind generation
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Chemical manufacturer
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Rougham Industrial Estate, Horizon House, Fred Castle Way, Bury St Edmunds, Rougham IP30 9ND (6 components)
• New build wind farm at Aberarder consisting of 12 wind turbines.
• load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
8.29 MW
Pwlldraenllwyn, Llangwyryfon, Wales, SY23 4SR (1 component)

Llangwyryfon MPAN ID: 1300050649070 The CMU is an onshore windfarm connected to the distribution system

Active • 2028-29 (T-4)
0.62 MW
Priestgill Wind Farm, Little Gill Farm, Abington ML12 6RW (1 component)

Wind farm consisting of 7 of 6.6MW wind turbines

Active • 2027-28 (T-4)
3.06 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (19 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• EV charging at residential premises
Active • 2026-27 (T-4), 2025-26 (T-1) ...
76.74 MW
*Please see cover letter regarding postcode Blary Hill wind farm, Off C20 road (Barr Glen Road), Glenbarr, Tarbert, Scotland, UK (2 components)
• Load reduction on site supported by non-exporting standby generation.
• New build wind farm at Blary Hill consisting of 14 wind turbines.
Active • 2025-26 (T-4), 2023-24 (T-4)
2.87 MW
Loading map...
Showing 25 locations