Open Cycle Gas Turbine (OCGT)

7 unique locations (383 components)

111 Brancroft Way Enfield Middlesex EN3 7PL (23 components)

Enfield CCGT Power Station - (one unit station)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2322.58 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (46 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2250.48 MW
Cottam Development Centre Power Station Cottam Retford DN22 0TF (13 components)

Cottam Development Centre (CDC) CCGT single unit station

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2108.55 MW
FK9 (15 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
21.16 MW
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (93 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3056.58 MW
Power Station Road Isle of Grain Rochester ME3 0AR (87 components)
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6556.61 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (106 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3602.30 MW
Loading map...
Showing 7 locations