Open Cycle Gas Turbine (OCGT)

56 unique locations (1986 components) - Page 1 of 3

111 Brancroft Way Enfield Middlesex EN3 7PL (23 components)

Enfield CCGT Power Station - (one unit station)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2322.58 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (12 components)
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1761.93 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (97 components)
• Aberthaw 7 OCGT fuel type gasoil
• Aberthaw 8 OCGT fuel is distillate
• Aberthaw 9 OCGT fuel type is gasoil
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2434.55 MW
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (18 components)
• Small gas fired CCGT.
• Small gas fired OCGT.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
186.17 MW
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
83.72 MW
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (32 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CHP module
• Existing OCGT module
Active • 2024-25 (T-4), 2023-24 (T-4) ...
428.74 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (52 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4669.77 MW
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (25 components)

Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
650.00 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (46 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2250.48 MW
Cottam Development Centre Power Station Cottam Retford DN22 0TF (13 components)

Cottam Development Centre (CDC) CCGT single unit station

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2108.55 MW
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (35 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 1 - OCGT, fuel is gas-oil
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
Active • 2028-29 (T-4), 2027-28 (T-4) ...
496.48 MW
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (39 components)
• Didcot B5 - CCGT
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7926.82 MW
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (17 components)
• Didcot B5 - CCGT
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4108.24 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (84 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
Active • 2028-29 (T-4), 2027-28 (T-4) ...
565.82 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (119 components)
• West Burton A Power Station CMU 2 WA2-19 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2450.85 MW
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (13 components)
• West Burton B Power Station CMU 1 WB1-18= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-19= 100% T_WBURB-2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (7 components)

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
252.00 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (7 components)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
252.00 MW
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (9 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1757.33 MW
31252.77 MW
FK9 (15 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
21.16 MW
Fort Parkway Heartlands Birmingham B24 9QT (9 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
133.92 MW
G33 (35 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
96.40 MW
Loading map...