Open Cycle Gas Turbine (OCGT)

29 unique locations (766 components) - Page 1 of 2

Abergelli Power Station, Felindre, Swansea, SA5 7NN (5 components)
• A new Open Cycle Gas Turbine (OCGT) peaking power plant (2)
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
1422.73 MW
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (13 components)

Small gas fired OCGT. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
450.80 MW
Brentfield Road Willesden London NW10 8JP (24 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590 (2)
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
130.65 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (33 components)
• Killingholme Module 1 converted to open cycle operation (2)
• Killingholme Module 2 converted to open cycle operation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9775.51 MW
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (27 components)
• Cowes 1 - OCGT, fuel is distillate
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 2 - OCGT, fuel is distillate
Active • 2028-29 (T-4), 2027-28 (T-4) ...
396.23 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (52 components)
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate
Active • 2028-29 (T-4), 2027-28 (T-4) ...
283.02 MW
Drax Power Station, Drax, Selby, YO8 8PH (22 components)

This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1691.35 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (58 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC
Active • 2028-29 (T-4), 2027-28 (T-4) ...
86.43 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (83 components)
• West Burton A Power Station CMU 3 WA3-19 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-1 = 100% (T_WBUGT-1)
• West Burton A Power Station Gas Turbine CMU 1 WG1-18 = 100% T_WBUGT-1
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (47 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
48174.56 MW
Factory Lane Croydon Surrey CR0 3RL (7 components)

Existing OCGT.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
131.30 MW
Fort Parkway Heartlands Birmingham B24 9QT (16 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
267.28 MW
Indian Queens Power Station St. Dennis St. Austell PL26 8BY (12 components)
• Indian Queens Power Station
• Indian Queens Power Station. Extra information: Technology Class and Fuel Type: "OCGT and Reciprocating Engines: Diesel".
Active • 2028-29 (T-4), 2027-28 (T-4) ...
130.89 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (39 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4157.42 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
169.83 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (24 components)
• Little Barford 1 CCGT
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2027-28 (T-4) ...
673.64 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (34 components)
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes (2)
• The CMU is a Open Cycle Gas Turbine (OCGT)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3478.52 MW
Newton Aycliffe CO Durham DL5 6EA (17 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.56 MW
Power Station Road Isle of Grain Rochester ME3 0AR (60 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1271.89 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (77 components)
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Gas Oil as specified by BS2869 Class A2
• Ratcliffe Unit 1 coal-fired unit
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.19 MW
Loading map...
Showing 25 locations