Open Cycle Gas Turbine (OCGT)

67 unique locations (1235 components) - Page 3 of 3

Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 10 x 2MW OCGT gas reciprocating engines
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 component)

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Inactive • 2022-23 (T-4)
Rosper Road Immingham North Lincolnshire DN40 3DZ (2 components)
• New build open cycle gas turbine
• New build open cycle gas turbine generating plant
Active • 2025-26 (T-4), 2024-25 (T-4)
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (1 component)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Inactive • 2022-23 (T-4)
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (11 components)

Gas fuelled CHP generation plant

Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.58 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure

Active • 2024-25 (T-4), 2023-24 (T-4) ...
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HW (3 components)
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Ty Coch Farm Greenfield Holywell CH87HT (8 components)

Gas fuelled generation plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
• A new 299MW Open Cycle Gas Turbine peaking plant
• A new Open Cycle Gas Turbine peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Victory Road, Derby, Derbyshire, DE24 9HX (8 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Active • 2028-29 (T-4), 2027-28 (T-4) ...
50.55 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Whitewall Road, Rochester, Kent, ME2 4DZ (3 components)

A series of gas generators on an existing site.

Active • 2026-27 (T-4), 2024-25 (T-1) ...
19.04 MW
Whitewalls Road, Rochester, Kent, ME2 4DZ (1 component)

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
18.70 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (37 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2921.10 MW
Wytch Farm, Wareham BH20 5JR (5 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 17 locations