Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

150 unique locations (1679 components) - Page 5 of 6

Active MW: 111795.11 MW
Inactive MW: 832.90 MW
Newton Aycliffe CO Durham DL5 6EA (6 components)

Existing Gas Engine (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
3.22 MW
Newton Aycliffe, CO Durham DL5 6EA (15 components) Geocoding Needed
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.41 MW
Pembroke Power Station, Pembroke, Dyfed, SA71 5SS (55 components) Geocoding Needed
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19010.04 MW
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (4 components) Geocoding Needed

Existing OCGT plant.

Open Cycle Gas Turbine (OCGT) RIVER NENE POWER LIMITED Existing Generating CMU Peterborough Power Peterborough Power +2 more PE1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
922.24 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (15 components) Geocoding Needed
• Peterhead 1
• Peterhead CCGT
• Peterhead CCGT for Delivery Year 2018/19 only
Combined Cycle Gas Turbine (CCGT) SSE THERMAL GENERATION (SCOTLAND) LIMITED Existing Generating CMU Peterhead Peterhead +12 more AB42
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13832.91 MW
Power Station Road, Isle of Grain, Rochester, ME3 0AR (55 components) Geocoding Needed
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6629.16 MW
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (5 components) Geocoding Needed
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) PROGRESS POWER LIMITED New Build Generating CMU Progress Power OCGT Progress Power OCGT +2 more IP23
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1136.65 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (16 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (2)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Coal Open Cycle Gas Turbine (OCGT) UNIPER UK LIMITED Existing Generating CMU Ratcliffe GT2 Ratcliffe GT2 +13 more NG11
Active • 2025-26 (T-1), 2023-24 (T-1) ...
475.11 MW
Ratcliffe-on-Soar, Nottingham, NG11 0EE (60 components) Geocoding Needed
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8570.86 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (3 components)

Gas turbine generator (3)

Open Cycle Gas Turbine (OCGT) ALKANE ENERGY UK LIMITED Existing Generating CMU Redditch Redditch B97
Active • 2024-25 (T-1), 2023-24 (T-1) ...
46.34 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components) Geocoding Needed
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
174.30 MW
Rockingham South, Smoke Land, Avonmouth, BS11 0YT (5 components) Geocoding Needed
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
• The CMU will consist of 2 MW's of containerised battery storage.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
40.21 MW
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 component) Geocoding Needed

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Open Cycle Gas Turbine (OCGT) ENERSYST LIMITED New Build Generating CMU Rockingham 2MW Conditional BS11
Inactive • 2022-23 (T-4)
1.90 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (2 components)
• New build open cycle gas turbine
• New build open cycle gas turbine generating plant
Open Cycle Gas Turbine (OCGT) VPI IMMINGHAM B LIMITED New Build Generating CMU VPI B OCGT VPI B OCGT DN40
Active • 2025-26 (T-4), 2024-25 (T-4)
Rosper Road, Immingham, North Lincolnshire, DN40 3DZ (18 components) Geocoding Needed
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11434.68 MW
RWE Cogen UK (Hythe) Ltd, Charleston Road, Hardley, Hythe, Southampton, SO45 3BP (4 components) Geocoding Needed
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
94.21 MW
RWE Cogen UK Limited, North South Access Road, Seal Sands, Middlesbrough, TS2 1FB (1 component) Geocoding Needed

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive • 2021-22 (T-4)
54.00 MW
RWE Generation UK plc, Ferrybridge A Workshop Site, Old Great North Road, Knottingley, WF11 8PR (1 component) Geocoding Needed

A CMU will be formed of an Open Cycle Gas Turbine unit.

Inactive • 2022-23 (T-4)
40.00 MW
Seabank Power Limited, Severn Road, Hallen, Bristol BS10 7SP (22 components) Geocoding Needed
• Multi Shaft CCGT (Module 1)
• Single Shaft CCGT (Module 2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4406.69 MW
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083

Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_SEALS-1 TS2
Inactive • 2020-21 (T-1)
Seals Sands Power Station, North South Access Road, Seal Sands, Middlesbrough, TS2 1FB (5 components) Geocoding Needed
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
162.00 MW
Severn Power Station West Nash Road Nash Newport Gwent NP18 2BZ (2 components)
• Existing CCGT that is to be refurbished
• Refurbishment of existing plant
Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Refurbishing Generating CMU Severn Unit 1 and 2 Severn Unit 20 NP18
Active • 2027-28 (T-4), 2025-26 (T-4)
Severn Power Station, West Nash Road, Nash, Newport, Gwent, NP18 2BZ (2 components) Geocoding Needed
• Existing CCGT that is to be refurbished
• Refurbishment of existing plant
Active • 2027-28 (T-4), 2025-26 (T-4)
Severn Power Station West Nash Road Nash Newport NP18 2BZ (3 components)

Existing CCGT Unit (2)

Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Existing Generating CMU Severn Unit 10 Severn Unit 20 +1 more NP18
Active • 2025-26 (T-1), 2024-25 (T-1)
1551.59 MW
Severn Power Station, West Nash Road, Nash, Newport, NP18 2BZ (18 components) Geocoding Needed
• Existing CCGT Unit
• Existing CCGT Unit which is to be refurbished
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2254.19 MW
Loading map...
Showing 25 locations